Similar Projects
Bowling Alley
New Construction
Conception
Greenwood, MS 38930

Carroll County Maintenance
Infrastructure
Post-Bid
$300,000 est. value
Carrollton, MS

Mill & Overlay approximately 6 miles of I-55
Infrastructure
Post-Bid
$3,447,263 CJ est. value
Hazlehurst, MS 39083

Overlay
Infrastructure
Results
MS

Placement of Stripe and Raised Pavement Markers
Infrastructure
Results

MS Delta Academies / Greenwood
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Greenwood, MS 38930

MS Delta Academies / Greenwood
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Greenwood, MS 38930

Carrollton Avenue New Parking Lot
Infrastructure
Post-Bid
$200,000 CJ est. value
Greenwood, MS 38930

Mill and Overlay Approximately 5 Miles on US 51 from 1.7 Miles North of SR 35 to the Montgomery County Line and Approximately 6 Miles from the Carroll County Line to Shady Lane in Winona
Infrastructure
Results

Jacob Aron Student Union Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$570,000 CJ est. value
Itta Bena, MS 38941

Apron Rehabilitation, Phase 3
Infrastructure
Results
$732,048 CJ est. value
Greenwood, MS 38930

Construction of Bridge and Approaches on County Road 71
Infrastructure
Post-Bid
$600,000 CJ est. value
McCarley, MS 38943

Water System Improvements
Infrastructure
Results
$206,500 CJ est. value
Sidon, MS 38954

Homeowner Rehabilitation Project
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$202,925 CJ est. value
Vaiden, MS 39176

Rebel Road EWP Bank Stabilization
Infrastructure
Results
$208,875 CJ est. value
Carrollton, MS 38917

Last Updated 02/21/2023 01:37 AM
Project Title

McAlister's Deli / Greenwood

Physical Address View project details and contacts
City, State (County) Greenwood, MS 38930   (Leflore County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Nearing Completion, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the demolition of the existing structure to make way for a McAlister's Deli. A general contractor has been selected. As of February 20, 2023, construction is 60% finished. All trades are let.

Details

Food/Beverage Service, 1 Story Above Grade, Approximately 3,000 SF New Construction, Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents