Similar Projects
Construction Of Clear Span Steel Shelter (Red Iron)
Results
Albany, GA 31707

Riverbend Park Community Center
New Construction - 39,805 SF
Results
Less than $5,559,883 est. value
Dalton, GA

Bus Shop I-New Fuel Island
Results
Less than $1,500,000 est. value
Canton, GA 30115

Construction of New Transportation Facility
New Construction
Results
Less than $3,000,000 est. value
Cleveland, GA

City Truck Wash Bay
Results
Less than $43,700 est. value
Omega, GA

Avgas Fuel Facility Improvements
Renovation
Results
$184,495 est. value
Cairo, GA 31728

Lee County Bus Maintenance Facility
New Construction
Results
GA

Liberty Transit Bus Shelters
New Construction
Post-Bid
Hinesville, GA 31313

Last Updated 08/09/2021 09:06 AM
Project Title

Construction Of Safe Room At Fire Station 29

Physical Address View project details and contacts
City, State (County) Canton, GA 30115   (Cherokee County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a safe room shelter at Fire Station 29 located at 3451 Cumming Hwy, Canton, GA 30115. The room shall be in accordance to FEMA P-320 Safe Room guidelines with noted exceptions by Cherokee County.

Details

1 Misc. Structures, 196 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents