Similar Projects
Crystal Lagoon
New Construction
Conception
FL

Bellweather Multifamily
New Construction
Conception
$138,800,000 est. value
Oxford, FL 34484

South 19 Avenue Apartments
New Construction - 13,120 SF
Design
Hollywood, FL

SunStop #351 (Wildwood) Petroleum
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Wildwood, FL 34785

Landstone Communications Building
New Construction, Infrastructure - 626 SF
Sub-Bidding
$135,000 CJ est. value
Sumterville, FL 33585

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Sprouts Farmers Market #650 / The Villages
Demolition, New Construction, Infrastructure - 23,256 SF
Post-Bid
$6,200,000 CJ est. value
The Villages, FL 32162

I-75/ Sumter County Asset Maintenance
Results
Less than $14,761,000 est. value
FL

Resurfacing
Results
Less than $13,439,799 est. value
FL

Parkview Apartments
New Construction - 320,791 SF
Construction
$10,000,000 CJ est. value
Wildwood, FL 34785

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

Twisted Oaks Pointe
New Construction, Infrastructure
Pending Verification
$550,500,000 CJ est. value
Wildwood, FL 34785

interior modernization of our public housing units
Renovation
Post-Bid

Driveway Apron for Rainbow Lakes Substation
Results
Sumterville, FL

Sumter County Service Center Site Modification
Infrastructure
Post-Bid
$400,000 est. value
Wildwood, FL 34785

Last Updated 08/01/2022 12:09 PM
Project Title

Eden Villages

Physical Address View project details and contacts
City, State (County) Wildwood, FL 34785   (Sumter County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $36,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of 799 and 1,268-square-foot apartments. Scope details have not been released. As of July 21, 2022, a general contractor has been selected, however, information regarding the architect and a timeline for construction have not been confirmed at this time. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

1 Story Above Grade, Apartments, 130 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents