Similar Projects
Culvert Preservation
Infrastructure
Design
$375,000 CJ est. value
Galion, OH 44833

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Resurfacing(Various Roadways)
Infrastructure
Bidding
$832,153 CJ est. value
Bucyrus, OH 44820

Township Road 50 Improvement
Alteration
Post-Bid
Galion, OH 44833

Street Improvements 2022
Infrastructure
Post-Bid
$1,403,456 est. value
Bucyrus, OH

Edgewood Drive Reconstruction
Infrastructure
Results
Bucyrus, OH 44820

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

CRA-JT TWP-HM Paving (Various Roadways) Resurfacing Project RE-BID
Infrastructure
Construction
$661,471 CJ est. value
Bucyrus, OH 44820

CRA-JT TWP-HM Paving (Various Roadways) Resurfacing Project RE-BID
Infrastructure
Construction
$661,471 CJ est. value
Bucyrus, OH 44820

Street Improvements - Arrowhead Drive
Alteration
Post-Bid
$200,000 est. value
Bucyrus, OH 44820

Four Lane Resurfacing - US 30-15.80
Infrastructure
Results
OH

Resurfacing and Reconstructing a Portion of Marion-melmore Road (Cr 1)
Infrastructure
Post-Bid
$500,000 est. value
OH

Spot Patching / Pavement Repair - D03 RM FY2022
Infrastructure
Results

Paving Project
Infrastructure
Post-Bid
$165,000 est. value
OH

Major Reconstruction - CRA-SR 602-04.25
Infrastructure
Results
$8,940,997 est. value
OH

Last Updated 03/17/2023 04:18 AM
Project Title

Bridge Preservation

Physical Address View project details and contacts
City, State (County) Bucyrus, OH 44820   (Crawford County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2027
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace Concrete BoxCRA SR 0100 18.42 As of March 17, 2023, the project is in Design status. Anticipated letting date is July 01, 2026. OHDOT - Bridge Preservation - SR 100 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents