Similar Projects
South Avenue Development
New Construction - 870 SF
Conception
Less than $500,000 CJ est. value
Plainfield, NJ

305 Westside
Renovation
Conception
Jersey City, NJ

Monroe Street Mixed-Use Development
New Construction - 64,225 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Hoboken, NJ 07030

The Halo
New Construction - 1,171,142 SF
Design
$10,000,000 CJ est. value
Newark, NJ 07102

Bid #1 Gym Refurbishing
Bidding
Westfield, NJ 07090

Fitness Together
Build-Out - 1,382 SF
Post-Bid
Montvale, NJ 07645

Gym Renovation
Renovation
Post-Bid
Rahway, NJ 07065

Holbein Gymnasium Renovation
Renovation
Results
$730,000 est. value
Mount Holly, NJ 08060

The Club at Woodbridge Indoor Ice Rink
Results
Woodbridge, NJ 07095

The Davenport
Renovation, Demolition
Construction
$14,500,000 est. value
Somerville, NJ 08876

Meridia Lifestyle II
New Construction - 197,500 SF
Construction
Linden, NJ

Pilates Studio
Build-Out
Pending Verification
Shrewsbury, NJ 07702

PowerPack CrossFit
New Construction
Pending Verification
Atlantic Highlands, NJ

Ohr Chaim Meir High School
New Construction
Conception
Lakewood, NJ 08701

WowMoms World Group Fitness
Renovation - 6,200 SF
Design
Paramus, NJ 07652

Last Updated 11/14/2019 08:46 AM
Project Title

Governor Street Training Facility

Physical Address View project details and contacts
City, State (County) Paterson, NJ 07501   (Passaic County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Qualified Bidding.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Applicant will remove the third, fourth, and fifth floors of the existing building. The first floor will be renovated to include restrooms, locker rooms, concession space, and storage space. The second floor will be renovated to include restrooms, offices, and a gym training facility. The project will result in a renovated 2 story building to include an indoor soccer field.

Details

1 Fitness Center, 2 Stories Above Grade, 35,000 SF Renovation, 29 Parking Spaces, 3 Stories Above Grade, Demolition.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents