Similar Projects
Fire Alarm System Replacement - PAB
Alteration
Bidding
Denver, CO 80204

PP6509 Mitchell - PP6509 Mitchell Fire Alarm and Detection System Recplacement
Post-Bid
CO

Replacement/Upgrade of the King Center Fire Alarm System
Post-Bid
Denver, CO 80204

Denver, CO - Fire and Life Safety Services
Results
Denver, Westminster, CO

Z1DA--554 Replace Spray Fireproofing Buildings K and H (VA-19-00078184)
Results
Less than $25,000 est. value
Denver, CO

IHKA009 VCLC Fitz Infrastructure Upgrades - Fire Detection System
Post-Bid
Denver, CO 80203

Wyman Fire Sprinklers
Results
$350,000 est. value
Denver, CO 80210

Thomas Jefferson HS Fire Detection Replacement
Post-Bid
CO

Tivoli Student Union Fire Pump Replacement
Results
$150,000 to $200,000 est. value
Denver, CO 80204

Fire Panel Replacement and Upgrade Project
Post-Bid
CO

2019-035M18 R/R Fire Protection Systems Gyc & Lkmt Ph2
Results
$750,000 est. value
Golden, CO 80401

FS 0002 Hamilton MS Fire Sprinkler Install
Post-Bid
CO

DWCF Fire Damper Replacement
Alteration
Results
Less than $1,150,000 est. value
Denver, CO 80239

Baker Fire Sprinkler Install 2021
Post-Bid
Denver, CO 80204

Merrill Fire Sprinkler Install
Alteration
Results
Denver, CO 80210

Reported 12/01/2021 12:00 AM
Project Title

Park Hill - Fire Alarm Replacement

Physical Address View project details and contacts
City, State (County) Denver, CO 80220   (Denver County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: a. New Fire Alarm Control Panel, annunciator and Remote Status Panel (LCD) b. Remove all existing FA cabling. Existing cabling may use where approved by DPS c. Remove all Conduits/Wiremold/Panduit/Boxes associated with the Fire Detection RFP that does not meeting the current DPS Design and Construction Standards. d. Install new cabling and wiremold throughout the building in accordance with DPS Design and Construction Standards, (new cabling color shall be determined by the DPS QA/QC department). All wiremold to be installed below existing ceilings. e. All new installation cabling work shall be in conduit or wiremolding where approved by DPS f. Install Initiation Devices (smoke, heat, CO and manual pull stations as needed) according to the AHJ. g. Remote lights as needed h. Install Notification Devices (Voice and Strobes) i. LED Dictionary (s) and Map(s),LED Point-lit Graphic Annunciator or Computer Graphic Annunciator. Indicate on bid type of annunciator being proposed. j. Guards as needed to comply with NFPA 72 and DPS Design Standards k. Elevator(s): Connections and Upgrade. Elevator shunt trip l. Kitchen Hood System(s): All kitchen hood suppression connections m. All HVAC Systems must shutdown on General Alarm (including but is not limited to the Building Automation Systems). n. Fire/ Smoke Damper Controls (all existing fire and smoke dampers must properly engage). o. Building Automation Systems: Contractor to Subcontract all Building Automation System Connections and equipment shutdowns with DPS Controls Vendor. p. Fire Sprinkler System: i. Flow(s)/ Tamper(s) Switch Connections ii. If Flow(s)/ Tamper(s) are not monitored or functioning correctly, Contractor shall subcontract a Fire Suppression contractor to install/ replace components under this RFP. q. Auditorium/ Gym and other locations as needed : Lighting/ Sound Control Connection r. Remove all detection and conduct in the attic and terminate. No detection to be reinstalled s. AES Subscriber Installation/ Connection. Update as needed for new detection to comply with AHJ for separate alarm signals. t. Replace and Upgrade: i. For Ceiling Tiles: The entire ceiling tile(s) affected by the removal. u. New Graphic Maps and Annunciators. DPS to provide new room numbers after project award v. Updating all Electrical Panel Labels w. Patch and Painting. i. Where Conduits/Wiremold/Panduit/Boxes have been removed, Contractor shall patch and paint (matching existing wall color): ii. All new wall mounted devices mounted in the existing locations shall have the wall patch and paint (matching existing wall color) iii. For Drywall/ Plaster: 6” width to the left and right of the removal location times the length. Contractor shall patch and paint (matching existing wall color).

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents