Similar Projects
Ballard Street Culvert Restoration
Bidding
Saugus, MA

Scheduled and Emergency Drainage Structure and Pipe Cleaning at various Locations
Results
Less than $900,000 est. value

Crescent Marsh Culvert Replacement Under Unnamed Access Road to Wheelabrator Technologies
Results
Less than $2,739,542 est. value
Saugus, MA 01906

Boat Ramp and Retaining Wall Improvements
Results
Less than $350,000 est. value
Ipswich, MA

Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Results
Less than $409,271 est. value

Ferry Lane Sewall Repair Project
Results
Less than $50,000 est. value
Marblehead, MA 01945

Fort Sewall - Fort Restoration Phase II
Results
Less than $146,000 est. value
Marblehead, MA

Harvard Avenue Seawall Repair
Results
Less than $20,000 est. value
Marblehead, MA

Gallison Avenue Seawall Repair Project
Results
Less than $50,000 est. value
Marblehead, MA

Foundation Drainage Repairs
Results
Less than $29,600 est. value
Methuen, MA 01844

Parker Lane Seawall Repair
Results
Less than $20,000 est. value
Marblehead, MA

Peabody Lane Seawall Repairs
Results
Less than $20,000 est. value
Marblehead, MA

Scheduled A Emergency Drainage Repairs and Improvements at Various Locations
Results
Less than $964,171 est. value

Drilling IDIQ in Massachusetts and Rhode Island
Results

Barker Street Culvert Replacement
Results
Less than $280,000 est. value
North Andover, MA

Last Updated 12/23/2020 11:23 AM
Project Title

Singing Beach Revetment and Harbor Street Seawall Repairs

Physical Address View project details and contacts
City, State (County) Manchester-By-The-Se, MA   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Projects which includes, but is not limited to services for Revetment Repairs to remove and replace stone block as shown, install fortification stone with geotextile and complete in accordance with project documents; Seawall Repairs: remove the existing seawall, fortification blocks and fill materials on the beach, provide boring sample, install new seawall as shown and all other materials associated with the work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents