Similar Projects
4Front Office And Industrial Area Expansion
Addition, Infrastructure - 310,000 SF
Conception
Oakdale, MN

Central Greenway Regional Trail - PR-009 - City of Elmo
Alteration
Conception
$200,000 est. value
Lake Elmo, MN

Royal Gateway
New Construction, Infrastructure - 435,000 SF
Design
$234,000,000 CJ est. value
Woodbury, MN 55125

Radio Drive to Interlachen Parkway / Woodbury
Infrastructure
Design
$2,425,856 CJ est. value
Woodbury, MN 55125

Valley Creek Park Habitat Enhancement Project - Phase 1
Infrastructure
Bidding
$1,000,000 CJ est. value
Woodbury, MN 55125

Gordon Bailey ES Pavement Rehabilitation
Post-Bid
Woodbury, MN 55129

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Highway 36 and Manning Avenue Interchange
Results
MN

Tamarack Farms Estates Street Improvements
Results
Lake Elmo, MN

Cornerstone Village Apartments
New Construction
Construction
$1,680,000 est. value
Oakdale, MN 55128

Rolling Meadows Residential Development
New Construction, Infrastructure
Construction
Cottage Grove, MN

Kindercare - Benjamin Drive / Woodbury
New Construction, Infrastructure - 12,000 SF
Pending Verification
$2,400,000 CJ est. value
Woodbury, MN 55129

Kindercare - Benjamin Drive / Woodbury
New Construction, Infrastructure - 12,000 SF
Pending Verification
$2,400,000 CJ est. value
Woodbury, MN 55129

2025 Street Improvements - PW-041 - City of Lake Elmo
Infrastructure
Conception
$5,540,000 est. value
Lake Elmo, MN

Preserve Trail Development / Woodbury
Infrastructure
Design
$5,184,990 CJ est. value
Saint Paul, MN 55125

Last Updated 10/12/2022 11:50 PM
Project Title

Lake Road 4 to 3 Lane Conversion and Pavement Management

Physical Address View project details and contacts
City, State (County) Woodbury, MN 55125   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,276,340 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Lake road 4 to 3 lane conversion and pavement management, consisting of the major work items in the following approximate quantities: est. Qty unit item 2109 lf remove curb and gutter 3156 sy remove bituminous pavement 55,617 sy mill bituminous surface (2.00") 7,867 ton type sp 12.5 wearing course mixture (4,e) 402 ton type sp 12.5 wearing course mixture (3,b) 3060 sf 6" concrete walk 845 lf concrete curb and gutter design b618 1264 lf concrete curb and gutter design d412 1 ls revise signal system a & b 10,012 lf 4" solid line multi comp 3730 lf 4" double solid multi comp 1976 lf 4" broken line multi comp 15307 lf 6" solid line multi comp 1112 lf 6" broken line multi comp 601 lf 12" solid line multi comp 612 sf crosswalk pref thermo gr in The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. A-Equal Employment Opportunity on Federal and Federal-Aid Construction Contracts (including supportive services), it will affirmatively assure increased participation of minority groups and disadvantaged persons and women in all phases of the highway construction industry, and that on any project constructed pursuant to this advertisement equal employment opportunity will be provided to all persons without regard to their race, color, disability, age, religion, sex or national origin; in accordance with the Minnesota Human Rights Act, Minnesota Statute 363A.08 Unfair discriminatory Practices, A minimum goal of 15.9 % Good Faith Effort to be subcontracted to Disadvantaged Business Enterprises. Contractor must start construction operations on June 13, 2022 Completion- on or before August 12, 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents