Similar Projects
SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Bidding
$500,000 to $20,000,000 est. value

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Air Force Contract Augmentation Program (AFCAP) V
Results

Job Order Contracts (Joc) Region C
New Construction, Renovation
Results
$10,000,000 est. value

USACE Philadelphia District-wide SRM MATOC
New Construction
Design
$25,000,000 to $100,000,000 est. value
Philadelphia, PA 19107

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Multiple Award Indefinite Quantity/Indefinite Delivery (IDIQ) Contract with Design/Build Capabilities for West Virginia and Western Virginia
Results
Less than $20,000,000 est. value
Bristol, Covington, Galax, Martinsville, Norton, Radford, Roanoke, Salem, VA

Proposed Wood County Multi-Purpose Building and Emergency Shelter
New Construction
Design
Parkersburg, WV 26101

ERSC MATOC
Post-Bid
$100,000 to $90,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Post-Bid

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Last Updated 02/04/2022 09:59 AM
Project Title

Municipal Building Elevator Modernization Project

Physical Address View project details and contacts
City, State (County) Parkersburg, WV   (Wood County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Controller - TAC 32 Controller (includes options listed below) o 24 VDC signal voltage o Auto light and fan feature o Car independent service o Car traveling lantern circuitry o Door bypass operation o Electronic door detector interface o Hoist-way access and enable o THY Board - Battery lowering in controller - Solid state starters (6 or 12 leads) 208 VAC - Security integration with building systems Power Unit - EP-230 power unit (submersible) - 55-gallon drum of biodegradable oil (Citgo NZ) - 3" shutoff valve kit Jack - Piston (plunger) - Packing Car - 21" toe guard - 4" car roller guides (set of 4) (spring loaded) - Fan: two speeds - 5 pin lock with electric contact for car top exit Hoist-way - Steel tape with mounting hardware, selector, and magnets (terminal limits included) - TAC 32 field friendly wiring package includes single traveling cable, hoist-way wiring, interlock wiring, interlock connectors, and serial wiring. Pit - Pit stop switch - 3" shutoff valve kit - Pit ladder 16'' wide Cab - Car door (SSCO, #4 S/S (441)) (South (rear) elevator has two car doors). Door Equipment - Interlock / pick up assemblies for existing dover operators (includes closers), (south (rear) elevator will have one for front and rear door). - LD-16 plus door operator with complete car side equipment (south (rear) elevator will have on for front & rear) o Includes adapter kit (tracks & hangars), clutch (w/ car door lock latch & contact), & car top inspection station (w/alarm signal) - Micro light (south (rear) elevator will have on for front & rear) - Hoist-way hanger / hanger rollers - Gibs Car Fixtures - Main car station includes options below o Applied panel - Vandal resistant floor buttons - Cast braille plates for car features - Standard key switch package o Fan o Light o Independent o Stop o Inspection/Hoist-way Enable - Emergency light mounted in COP - 2004 and later fire service phase II features (includes instructions signage) - Handicap signal (passing signal) - Position indicator (2" CE segmented) - ADA phone system integral with COP (Rath) - Locked service cabinet - Certificate window - GFI outlet - #4 stainless steel finish (441) - Car riding lantern (standard) #4 S/S (441) (south (rear) elevator will have two lanterns). Hall Fixtures - Fire service phase I key switch - Fire service phase I engraved instructions - Horizontal fusion hall position indicator (2" Digital) #4 S/S (304) - Hoist-way jamb braille (pair of cast plates) (# of floors) - Hoist-way access switch (standalone) - Terminal hall stations (surface mounted) with o Appendix O (polycarbonate insert flame with engraved verbiage) o Fusion (#4 S/S (304)) - 2009 & 2010 elevator communications failure add - Terminal hall stations (surface mounted) with o Appendix O (polycarbonate insert flame with engraved verbiage) o Fusion (#4 S/S (304)) - Intermediate hall stations (surface mounted) with o Appendix O (polycarbonate insert flame with engraved verbiage) o Fusion (#4 S/S (304)) - Intermediate hall stations (surface mounted) with o Appendix O (polycarbonate insert flame with engraved verbiage) o Fusion (#4 S/S (304))

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents