Similar Projects
Last Updated | 11/06/2019 03:38 PM |
Project Title | Rehabilitation of a Storm Sewer Pipe in Grafton Woods |
Physical Address | View project details and contacts |
City, State (County) | VA (York County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The intersection of Bam Swallow Ridge and Falling Springs Run. The work will be CIPP (cured in place pipe) trenchless technology. The contractor is to clean the existing pipe and tv said pipe prior to installation of the liner. The dimensions of the storm sewer pipe are 36 in and approximately 230 linear feet of pipe which will be repaired. The work also includes repair work to the concrete apron and asphalt at the entrance of Bam Swallow Ridge which is associated with the failure of abovereferenced storm sewer pipe. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |