Similar Projects
Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted
Post-Bid
FL

Deep Injection Well Monitoring Well MW-1 Replace
Results
West Palm Beach, FL

Construction Moss Pilot Project
Results
West Palm Beach, FL

Well Drilling and Repair Services
Term Contract
Post-Bid
FL

System-Wide Wellfield Improvements - Phase 1
Results
Less than $12,104,730 est. value
Boca Raton, Delray Beach, FL

Upper Floridan Aquifer (UFA) Well Rehabilitation
Post-Bid
$1,800,000 est. value
Belle Glade, FL 33430

Water Treatment Plant Class I Injection Well System Mechanical Integrity Testing
Results
Less than $70,000 est. value
Wellington, FL 33414

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Post-Bid
FL

Floridan Well Rehabilitation Program
Results
Jupiter, FL 33458

Secondary Effluent Yard Piping for Biosolids Hex Loop Upgrades
Results
West Palm Beach, FL 33417

Injection Well No. 2 Construction
Results
Delray Beach, FL 33445

Floridian Aquifer System Explorartory Coring and Monitoring Well Construction
Term Contract
Results
West Palm Beach, FL 33401

Mechanical Integrity Testing of the SRPF, WTP 11, and SROC Deep Injection Well Projects
Results
$145,000 est. value
Belle Glade, Boca Raton, Delray Beach, FL

G-310/G-335 950 CFS Pump Overhaul Project
Results
$2,660,000 to $2,940,000 est. value
West Palm Beach, FL

Last Updated 10/20/2021 08:54 AM
Project Title

Replacement of Surficial Aquifer Well No. 10

Physical Address View project details and contacts
City, State (County) Palm Springs, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $994,949
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing one (1) new replacement production well, proposed Well No. 10A and demolition/plugging/abandonment of existing Well No. 10 including test well/pilot hole drilling, drilling, setting of casings and/or well screen, grouting, testing, well logging, video logging, pump testing, formation water disposal system (including temporary piping and pumps), well facility disinfection, fencing, clearing and restoration of well sites, new pump and motor including column pipe and appurtenances, well head piping and appurtenances, flow meter, raw water main piping, electrical and controls, site work and restoration, The project also consists of furnishing all labor, equipment, and materials necessary to install cured-in-place pipe lining of existing sanitary sewer and service laterals, rehabilitation of existing sanitary sewer manholes, and testing / pressure grouting of existing sanitary sewer service piping including applicable site work and restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents