Similar Projects
Roadside Safety Improvements
Infrastructure
Design
$3,831,000 est. value
Holtville, CA

San Diego State University IV Dorms
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Calexico, CA 92231

2023 Streets Overlay Project
Infrastructure
Bidding
$3,500,000 CJ est. value
El Centro, CA 92243

2023 Streets Overlay Project
Infrastructure
Bidding
$3,500,000 CJ est. value
El Centro, CA 92243

Drilling Services
Term Contract
Post-Bid
Calexico, CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Asphalt Rubber Binder Chip Seal, Pavement Markings and Shoulder Backing
Infrastructure
Results
$3,400,000 est. value
CA

Residence Inn by Marriott
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
El Centro, CA 92243

Statevolt Battery Gigafactory
New Construction, Infrastructure
Pending Verification
$4,000,000,000 CJ est. value
Brawley, CA 92227

Heber Meadows Apartments Residential Development / El Centro
New Construction, Infrastructure
Design
$108,633,600 CJ est. value
El Centro, CA 92243

Y--Gaoa Cahuilla Ranger Station Replacement
New Construction, Infrastructure - 12,171 SF
Bidding
$10,000,000 CJ est. value
Brawley, CA 92227

Minor B - Small Business (SB) - Place Micro-Surfacing and Install Bike Facility
Infrastructure
Post-Bid
$330,000 CJ est. value
Calipatria, CA 92233

Cold in -Place Recycling, RHMA-G Overlay, Pavement Markings
Infrastructure
Results
$3,880,000 est. value
CA

Rockwood Avenue Fourplex
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Calexico, CA 92231

Last Updated 06/02/2023 06:34 PM
Project Title

K Street Improvements Project

Physical Address View project details and contacts
City, State (County) Brawley, CA 92227   (Imperial County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $668,625 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 02, 2023, project was awarded to Hazard Construction Company., and the awarded amount is $735,487.22.** The Work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The City of Brawley intends to improve K Street from the intersection of HWY 86 to 8th Street. The improvements consist of micro milling 1/2-inch (0.04 feet) for the thru lanes of the street and 1-inch within shoulder areas for an approximate width of 47 feet. After micro milling activities have been completed the contractor shall install a 0.5-inch (0.04 feet) conventional 3/8-inch Hot Mix Asphalt leveling course. After the contractor installs leveling course, the contractor shall then install a 1-inch (0.08 feet) 1/2-inch Asphalt Rubber Hot Mix. The improvements also consist of the installation of curb, gutter, and ADA handicap ramps. COMPLETION OF WORK: The work must be completed within 60 calendar days after the commencement date stated in the Notice to Proceed. CONTRACTOR'S LICENSE: The contractor shall have a State of California Classification "A" Contractor's license to perform the work. A bid submitted by any contractor not properly licensed at the time of bid opening shall be considered non-responsive and will be rejected The Contract for the work advertised will be awarded to the lowest responsible bidder. The city reserves the right to reject all bids, waive any irregularities, or dispense with further bidding. LIQUIDATED DAMAGES: Liquidated Damages of $500.00 per calendar day are included in this project. Questions during the bidding process shall be directed to Ms. Ana Gutierrez, via email at agutierrez@brawley-ca.gov, Telephone (760) 344-5800, Ext. 21 no later than 5:00 p.m. March 27, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents