Similar Projects
Wastewater Treatment Plant
New Construction
Design
Buena Vista, GA

Water Treatment Plant #1 Aerator Replacement
Bidding
Kingsland, GA 31548

Etowah Water Treatment Plant - Plate Settler Design
New Construction
Bidding
Ball Ground, GA 30107

Thermal Dryer Equipment Selection
Post-Bid
Athens, GA

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Post-Bid
Cedartown, GA

Ridgewood Water Production Facility
Results
Brunswick, GA 31520

Modifications to the Water Pollution Control Plant
Results
Dawsonville, GA 30534

Camp Creek WRF UV Replacement
Renovation
Bidding
Atlanta, South Fulton, GA 30349

Riverside Drive WTP High Service Pump No. 7
Post-Bid
Gainesville, GA 30501

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Water Treatment Services (Annual Contract)
Term Contract
Post-Bid
Savannah, GA 31401

Install Infrastructure for Pilot Study
Results
Cumming, GA 30040

Loopers WTP Dewatering Facilities Upgrade
Post-Bid
Dalton, GA

Raw Water Intake 1 - Grit Removal System Repair lamar Ham Water Treatment Plant Milledgeville
Results
Less than $9,549 est. value
Milledgeville, GA 31061

2019 Water Pollution Control Facilities Rehabilitation Academy Creek BGJWSC
Post-Bid
Brunswick, GA 31520

Last Updated 05/25/2021 09:10 AM
Project Title

Municipal WWTP Upgrades

Physical Address View project details and contacts
City, State (County) Moultrie, GA 31768   (Colquitt County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,361,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall generally consist of furnishing all products and performing all labor necessary to construct the following Installation of new mechanical screen at the headworks with relocation of the existing manual bar screen, replacement of mechanical equipment inside each of the four (4) primary clarifiers at the City of Moulirie WWTP. and all other appurtenances

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents