Similar Projects
C Hudson, Carmichael Road
Infrastructure
Conception
$250,000 CJ est. value
Hudson, WI 54016

Reconstruct Willow-Parkview - City of New Richmond
Infrastructure
Conception
$711,560 CJ est. value
New Richmond, WI 54017

2022 Curb and Sidewalk Repairs
Infrastructure
Design
$180,000 CJ est. value
Somerset, WI 54025

City of Hudson, Second Street - Construction / Reconstruction
Infrastructure
Design
$4,000,000 CJ est. value
Hudson, WI 54016

New Richmond Lead Service Line Replacement - Qualified Plumbers / Contractors
Infrastructure
Post-Bid
$670,000 est. value
New Richmond, WI

Saint Croix Government Center Phase Two - Site Utilities Package
Infrastructure
Post-Bid
$200,000 est. value
Hudson, WI 54016

2022 Street and Utility Improvements
Infrastructure
Results
Hammond, WI

2022 Dundas Road Improvements
Infrastructure
Results
$159,221 CJ est. value
Woodville, WI 54028

Bouchea Apartments
New Construction, Infrastructure - 23,757 SF
Construction
$25,000,000 CJ est. value
Hudson, WI 54016

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Hudson Medical Center
New Construction, Infrastructure - 160,000 SF
Pending Verification
$50,000,000 CJ est. value
Hudson, WI 54016

Riverfront Square
Demolition, New Construction, Infrastructure - 21,270 SF
Pending Verification
$4,500,000 CJ est. value
Hudson, WI 54016

Reconstruct 2nd from Dakota-Knowles/Green-Rounds - City of New Richmond
Infrastructure
Conception
$1,201,200 CJ est. value
New Richmond, WI 54017

Mixed-Use Development for the New Richmond Public Library Project
Demolition, New Construction, Renovation, Infrastructure - 27,000 SF
Design
$10,000,000 CJ est. value
New Richmond, WI 54017

New Library Building Project - City of New Richmond
Addition, New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
New Richmond, WI 54017

Last Updated 09/28/2023 11:57 AM
Project Title

2023 Williams Park Shelter Project

Physical Address View project details and contacts
City, State (County) Hudson, WI 54016   (Saint Croix County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 9/28/2023 no bids were received for this project. Information on the rebid of this project is not yet available. The project includes the construction of the restroom and all associated site work and utilities. No bid will be considered unless accompanied by a certified check or bid bond in the amount of five percent (5%) of the amount of the bid made payable to the City of Hudson as a guarantee that if the bid is accepted, the successful bidder will execute the Contract and furnish a performance bond and payment bond in the amount of the Contract with three (3) days after award of the Contract. Any questions and requests for substitutions must be made via email to the Architects office and will be accepted and answered through September 25, 2023. Direct any questions and requests to the Architects office via email to Nathan Burt at NathanB@WeAreStudioEA.com . The City of Hudson reserves the right to retain the deposits of the three lowest Bidders for a period not to exceed thirty (30) days after the date and time of Bid Opening. No Bids may be withdrawn for a period of thirty (30) days after the date and time of Bid Opening. The City of Hudson reserves the right to reject any or all proposals, to waive informalities in bidding, and to accept the bid deemed most advantageous to the City of Hudson. Prevailing wage rates are applicable to the project. The Project shall reach Final Completion by July 3, 2024. Failure to complete within this timeframe will result in Liquidated Damages of one-hundred (100) dollars per day until Final Completion is reached.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents