Similar Projects
On-call Railroad Property Maintenance of Way Services
Term Contract
Sub-Bidding
San Bernardino, CA 92410

Exterior Power Washing and Exterior Painting Services
Term Contract
Sub-Bidding
San Bernardino, CA 92401

Portable Toilet Project
Term Contract
Post-Bid
Avenal, Blythe, California City, Calipatria, Camarillo, Chino, Chowchilla, Coalinga, Corcoran, Corona, Delano, Folsom, Galt, Imperial, Ione, Jamestown, Lancaster, Malibu, Norco, Norwalk, Paso Robles, San Diego, San Quentin, Sloughhouse, Soledad, Stockton, Susanville, Tehachapi, Tracy, Vacaville, Warner Springs, Wasco, CA 93204

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Redlands DMV Field Office
Infrastructure, Alteration
Post-Bid
Redlands, CA 92374

Monthly Water Treatment Services
Term Contract
Results
San Bernardino, CA 92401

Whole Structure Fumigation
Term Contract
Results

800mhz Searchlight New Generator
Term Contract
Sub-Bidding
$250,000 CJ est. value
San Bernardino, CA 92415

Portable Restrooms
Alteration
Post-Bid

Street Striping and Pavement Marking Services Maintenance
Term Contract
Results
$436,843 est. value
Chino, CA

After-Hours Janitorial Services at the Barstow DMV Field Office
Term Contract
Sub-Bidding
$65,484 CJ est. value
Barstow, CA 92311

Janitorial Services
Term Contract
Post-Bid
Redlands, CA 92373

Trash Collection, Hauling, Recycle Pickup and Disposal Services in San Bernardino County
Term Contract
Results
$282,600 CJ est. value
Bloomington, CA 92316

J--FCC Victorville - Electrical Inspection (High Voltage)
Term Contract
Sub-Bidding
Victorville, CA 92394

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Trash Hauling and Disposal in San Bernardino County
Term Contract
Results
San Bernardino, CA 92401

Last Updated 04/27/2023 05:16 PM
Project Title

Annual Street Sweeping Services

Physical Address View project details and contacts
City, State (County) Big Bear Lake, CA 92315   (San Bernardino County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The successful bidder will mechanically sweep the entirety of all paved roads within the City from pavement edge to pavement edge. Sweeping shall take as many passes as necessary to clean the roadways and remove debris in a manner that is acceptable to the City of Big Bear Lake. Interested proposers should visit the site to understand the configuration of the roadways and the level of debristo be removed. No extra compensation shall be made for the number of passes or level of debris collected. The City of Big Bear Lake is seeking proposalsfrom qualified companies to provide annualstreet sweeping services, pursuant to the specifications provided within this document and all applicable laws and regulations. Street sweeping is a key activity to keep up the appearance of the City, to remove cinders and other debris left on the roadway from the winter season, and contribute toward the City's compliance efforts with the National Pollutant Discharge Elimination System (NPDES). The City performs routine, ongoing sweeping inhouse throughout the year and to supplement that effort, this proposal calls for a one-time sweeping of Citymaintained roadways within Big Bear Lake. The City of Big Bear Lake maintains approximately 88 centerline miles of streets within the City limits. Over the course of the year, the streets collect waste and debris from litter and other sources. Additionally, during the winter months, the City uses a large amount of cinders as part of the City's snow management efforts. Staff is seeking proposals for a one-time sweeping of all streets within the jurisdiction of the City of Big Bear Lake, which is approximately 88 centerline miles, to clean the roadways and remove all debris. It should be noted that the City of Big Bear Lake does not have jurisdiction or maintenance obligations over State Route 18, Big Bear Boulevard, as that is within the jurisdiction of the State of California and therefore, it is not within the scope of this project. Furthermore, there are approximately seventy (70) additional roadway sections within the City limits that are not maintained by the City of Big Bear Lake. These sections are not included within the 88 centerline miles, and therefore the scope of work, and they will be clarified with the contractor before work commences. April 18, 2023 Deadline for consultant questions, no later than 3:00 p.m. The City of Big Bear Lake reserves the right to reject any and all proposals and to waive any minor irregularities.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents