Similar Projects
Roofing MACC
Post-Bid

Roofing Repair and Maintenance
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Metal Roof Materials for PCC Barn
Results
Charleston, WV 25311

James H Tiger Morton Juvenile Center - Roof Replacement Project
Alteration
Post-Bid
Dunbar, WV 25064

Coopers Rock SF - Trading Post Roof Rehabilitation
Results
South Charleston, WV 25303

Roof Replacement at WVSP Detachment Wayne WV
Alteration
Post-Bid
South Charleston, WV

Chelyan Salt Building Roof Exit 85
Results
Charleston, WV 25306

Roof Replacement Project
Alteration
Post-Bid
Charleston, WV 25312

Building 13 Parking Garage Rubber Roof Replacement
Results
$14,500 est. value
Charleston, WV

Public Works Office Roof
Infrastructure
Post-Bid
Nitro, WV 25143

Roof Replacement Project
Results
$1,414,058 est. value
Charleston, WV

Roof Repair and Rehabilitation Work
Alteration
Post-Bid
Marmet, WV

WVCI Roof Repairs
Alteration
Results
$8,450 est. value
Charleston, WV 25301

Sissonville Bus Garage and Alban Elementary Roof Replacement
Alteration
Post-Bid
Charleston, Saint Albans, WV 25312

Last Updated 02/11/2022 09:18 AM
Project Title

CAP Roof Replacement

Physical Address View project details and contacts
City, State (County) Charleston, WV 25311   (Kanawha County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is to establish a contract to provide all labor, materials, tools, equipment, supplies and supervision to complete the roof system replacement at the Civil Air Patrol Charleston Headquarters Facility. Standing Seam Metal Roof: 1. Provide and install a lifetime finish/7 year workmanship warrantied, standing seam metal roof. See Exhibit B-1 for manufacturer and model used as basis for specification. Manufacturers and models specified are the standard by which all “or equal” bid products will be evaluated. 2. Install new metal roofing panels and accessories as per manufacturer specifications. Accessories to include; but are not limited to, bull-nose drip edge, gable rake metal, wall flashings, chimney flashings, pipe flashing boots, z-channel at ridges/hips, and hip/ridge cap metal. 3. Tear off existing roofing materials down to the deck. Sweep, clean, and prepare the deck for new materials. 4. Replace any rotten/damaged sheathing. 5. Furnish and install Ice & Water Shield at the gutter edge and around the roof top HVAC unit curbs 6. Install new Synthetic "dry-in" underlayment over the roof surface and secure using 1" plastic caps. (Not required on Steel deck) 7. Furnish and install 16” Striated Rib metal roof panels made of 26-gauge Fluoropolymer (Kynar 500) or equal coated metal (color chosen by owner) 8. Fabricate and install vented ridge cover made from 24-gauge Fluoropolymer (Kynar 500) or equal finished metal 9. Fabricate and install non-vented hip covers made from 24-gauge Fluoropolymer (Kynar 500) or equal finished metal 10. Fabricate and install drip edge and counter flashings made of 24-gauge Fluoropolymer (Kynar 500) or equal finished metal 11. Furnish and install Color Bar snow guards with S-5 mounting clamps over man door openings 12. If re-decking is required new 7/16" OSB sheathing will be installed over 1x6,1x8,1x10,1x12 slat boards. 13. Clean up all construction debris from the property and dispose of it properly daily. Includes running large magnets to pick up nails. Lap Seam Metal Roof: 1. Provide and install a lifetime finish/7 year workmanship warrantied, lap seam metal roof. See Exhibit B-2 for manufacturer and model used as basis for specification. Manufacturers and models specified are the standard by which all “or equal” bid products will be evaluated. 2. New metal roofing panels to be installed using exposed fastener system, and stainless steel rivets where required. 3. Accessories to include; but are not limited to, bull-nose drip edge, gable rake metal, wall flashings, chimney flashings, pipe flashing boots, z-channel at ridges/hips, and hip/ridge cap metal. 4. Tear off existing roofing materials down to the deck. Sweep, clean, and prepare the deck for new materials. 5. Replace any rotten/damaged sheathing. 6. Furnish and install Ice & Water Shield at the gutter edge and around the roof top HVAC unit curbs 7. Install new Synthetic "dry-in" underlayment over the roof surface and secure using 1" plastic caps. (Not required on Steel deck) 8. Furnish and install metal roof panels made of 26-gauge Fluoropolymer (Kynar 500) or equal coated metal (color chosen by owner) Fabricate and install vented ridge cover made from 24- gauge finished metal 9. Fabricate and install non-vented hip covers made from 24-gauge Fluoropolymer (Kynar 500) or equal coated finished metal (color chosen by owner) Fabricate and install drip edge and counter flashings made of 24-gauge finished metal 10. Furnish and install Color Bar (or equivalent) snow guards with S-5 mounting clamps over man door openings 11. If re-decking is required new 7/16" OSB sheathing will be installed over 1x6,1x8,1x10,1x12 slat boards. 12. Clean up all construction debris from the property and dispose of it properly daily. Includes running large magnets to pick up nails. Fiberglass-Based Asphalt Shingle Roof: 1. Provide and install a 40-year dimensional shingle roof system. See Exhibit B-3 for manufacturer and model used as basis for specification. Manufacturers and models specified are the standard by which all “or equal” bid products will be evaluated. 2. Completely remove and properly dispose of existing shingles to expose the roof deck 3. Install ice and water shield along the gutter edge and around the RTU curbs 4. Install synthetic underlayment over entire roof. 5. Install new drip edges 6. Install new step flashing 7. Fabricate and install new head wall and cover flashing 8. If re-decking is required new 7/16" OSB sheathing will be installed over 1x6,1x8,1x10,1x12 slat boards. 9. Clean up all construction debris from the property and dispose of it properly daily. Includes running large magnets to pick up nails.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents