Similar Projects
Marion Aquatic Center
New Construction
Conception
$22,000,000 to $27,000,000 est. value
Marion, IA

TBK Sports Complex Expansion
Addition
Conception
Bettendorf, IA 52722

Junior/Senior High School Gymnasium Addition
Addition
Bidding
Melcher-Dallas, IA 50163

Jacobson Athletic Building - Room 2035 - Remodel
Renovation
Bidding
$115,000 est. value
Ames, IA 50011

RecPlex Snow Removal and Ice Control Services
Renovation, Term Contract
Post-Bid
West Des Moines, IA 50266

Camp Dodge PT-7 Athletic Training Complex - Phase 2
New Construction
Post-Bid
Johnston, IA

UNI Football Practice Field Synthetic Turf Conversion
Renovation
Results
$1,465,000 est. value
Cedar Falls, IA

Hartley Community Pool
Infrastructure
Results
Hartley, IA

SCC Gymnasium
New Construction
Pending Verification
$5,000,000 to $6,000,000 est. value
West Burlington, IA

Pool & Athletic Facility Construction
New Construction - 61,000 SF
Pending Verification
$33,000,000 est. value
Waukee, IA

Custodial Services for MidAmerican Energy RecPlex
Term Contract
Post-Bid
West Des Moines, IA 50266

Modern Woodmen Park Floodwall Extension and Workout Room Addition
Addition, Infrastructure
Results
$1,700,000 est. value
Davenport, IA 52802

Bedell Family Ymca - Indoor Pool Improvements
Renovation, Alteration
Post-Bid
Spirit Lake, IA 51360

CGD Middle School Baseball-Softball Complex
New Construction
Results
Clarion, IA 50525

New Athletic Complex
New Construction - 24,000 SF
Post-Bid
Ottumwa, IA 52501

Last Updated 04/20/2022 12:32 PM
Project Title

Nevada Field House 2022

Physical Address View project details and contacts
City, State (County) Nevada, IA 50201   (Story County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility, Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,387,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new facility consisting of site work, concrete foundations and slabs, masonry, structural steel, pre-engineered metal building components, aluminum entrances and windows, interior steel stud framing and drywall, hollow metal doors and frames, finishes, hydraulic passenger elevator, and accessories.

Details

Athletic Facility, 55,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents