Similar Projects
Sludge Removal Louisville Water Treatment Plants
Term Contract
Bidding
Louisville, CO 80027

Sludge Hauling Services
Bidding
Louisville, CO

Dewatering Polymer
Post-Bid
Boulder, CO 80306

Disposal of Spoils City of Louisville Operations Division
Post-Bid
Louisville, CO 80027

On-Call Street Sweeping
Results
Longmont, CO

Disposal of Spoils 2020
Results
Louisville, CO 80027

Statewide Trash and Recycling Services
Term Contract
Post-Bid

Snow Removal for BCHA Properties
Results
Gunbarrel, Lafayette, Longmont, Louisville, Lyons, CO

Post Disaster Debris Collection Services
Post-Bid
Boulder, CO 80301

Manchester IRSC
Results
Nederland, CO

Boulder Airport Snow Removal Services
Post-Bid
Boulder, CO

Blue DOT IRSC
Results
Less than $25,000 est. value
Nederland, CO

Spoils Hauling
Post-Bid
Boulder, CO 80301

On-Call Emergency Debris Removal
Term Contract
Results
Longmont, CO 80501

Landscape Maintenance, Snow Removal and Flower Services
Post-Bid
Superior, CO 80027

Reported 07/29/2020 12:00 AM
Project Title

2020 - 21 Snow Removal and Ice Control Services

Physical Address View project details and contacts
City, State (County) Superior, CO   (Boulder County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall perform snow and ice control operations for the streets identified on the attached map per the levels of service listed below. McCaslin Boulevard, 76th Street, Sycamore Street, Rock Creek Parkway, 88th Street, Coalton Road, Indiana Street and Main Street. Torreys Peak Drive, Rock Creek Circle, Coal Creek Drive, Castle Peak Avenue, Huron Peak Avenue, Eldorado Drive, Pitkin Avenue, Mt. Sopris Way, Yarrow Circle, Superior Drive and Promenade Drive. Ice Cutting – the Town may request that the contractor provide labor and equipment necessary to remove ice buildup in specific locations throughout the Town. Ice cutting may include the application of de-icing material, heat, mechanical equipment or other means; and removal and hauling of ice to approved sites within the Town. Ice cutting must be done in a manner which will prevent damage to public improvements such as curb, gutter and sidewalks. Contractor shall be held responsible for excessive damage to the improvements.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents