Similar Projects
Ceiling and Lighting Replacement Project
Alteration
Bidding
$260,000 est. value
Lyons, IL 60534

2021 Alterations at Andrew HS, Sandburg HS & Stagg HS
Post-Bid
Orland Park, Palos Hills, Tinley Park, IL 60487

D15 Conyers Learning Academy Interiors
Post-Bid
Rolling Meadows, IL 60008

New Lockers Installation Chicago Academy ES
Results
Chicago, IL 60634

2021 Curtain Wall Replacement at Prospect HS
Results
Mount Prospect, IL 60056

Gymnasium Railing Replacement at Thornwood High School
Post-Bid
Tinley Park, IL

CPS Curie HS Gym Wall Removal and Installation of Vinyl Curtains (VT Pool)
Results
Chicago, IL 60632

Chamber Floor and Wall Repairs at the Chicago Harbor Lock
Post-Bid
$25,000,000 to $100,000,000 est. value
Chicago, IL

CPS Chappell Locker Replacement
Results
Chicago, IL 60625

Bath Tub Shower Insert
Alteration
Post-Bid
IL

CPS Whitney Young Theatre Rigging System
Results
Chicago, IL

CPS Lake View Interior Lock Rekey
Alteration
Post-Bid
Chicago, IL

CPS Dewey Univent Installation
Results
Chicago, IL 60609

Bridgeview Courthouse Tenant Improvements
Alteration
Post-Bid
Bridgeview, IL 60455

CPS Kennedy Locker Replacement
Results
Chicago, IL

Last Updated 05/12/2022 09:50 AM
Project Title

2022 Curtain Wall Replacement

Physical Address View project details and contacts
City, State (County) Mount Prospect, Rolling Meadows, IL 60056   (Cook County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of replacement of existing aluminum curtain wall system, translucent fiberglass panel windows, FRP doors, miscellaneous carpentry, removal and reinstallation of casework, epoxy resin countertops, gypsum assemblies, acoustical panel ceiling, resilient tile flooring, carpeting, interior paint, exterior concrete repair and coatings. MEP work consists of replacement of unit ventilators, lighting replacement, toilet room renovation including plumbing fixtures, and miscellaneous associated electrical work.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents