Similar Projects
Reported | 05/04/2022 12:00 AM |
Project Title | Kennedy Memorial Building - Boiler and HVAC Improvements |
Physical Address | View project details and contacts |
City, State (County) | Lincoln Park, MI 48146 (Wayne County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $150,000 [brand] Estimate |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Renovation of a playground / park / athletic field in Lincoln Park, Michigan. Completed plans call for the renovation of a playground / park / athletic field. The City of Lincoln Park, Michigan desires to renovate the existing HVAC/Boiler System inside the Kennedy Memorial Building as the current system is experiencing failures of older equipment. The Kennedy Memorial Building is located between London Avenue and Merril Avenue on Ferris Avenue, 3240 Ferris Avenue. The proposed renovations are comprised of 2 options, one is replacing the existing non-functional boilers and the second is to eliminate the boiler system and replace with forced air units and a mini-split system to supplement other areas. The City is seeking proposals in response to this Request for Proposals (RFP) from a qualified team (Contractor) to provide all aspects of the construction. Reference Number 0000286851 Piggyback Contract No Questions are submitted online No |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |