Similar Projects
District Wide Door Replacement
Bidding
Egg Harbor Township, NJ

Smoke and Fire Door Replacement - Ancora Psychiatric Hospital
Bidding
Less than $1,572,270 est. value
Hammonton, NJ 08037

Install New Automatic Sliding Entrance Doors and Associated Components
Post-Bid
Orange, NJ 07050

Group Home Renovations
Post-Bid
Bound Brook, NJ 08805

Nonpublic Schools Windows and Doors
Results
Lakewood, NJ 08701

Automatic Door Services
Results
Toms River, NJ 08754

Grunin Security Door
Bidding
Toms River, NJ 08756

Window Replacement at Eisenhower Middle School
Post-Bid
Succasunna, NJ 07876

Window Replacement and Concrete Sitework Office of Temporary Assistance
Results
Morristown, NJ 07960

Storefront Replacement at Building 8 (Early Learning Center)
Post-Bid
Mahwah, NJ 07430

Furnishing, Delivery and Installation of Replacement Glass Units
Results
New Brunswick, NJ 08901

Window Replacement for Cumberland County Library Complex
Post-Bid
Bridgeton, NJ 08302

Window Replacement at Melvin H. Kreps Middle School
Results
$441,000 est. value
Hightstown, NJ 08520

Provide and Install Replacement Doors and Frames at Various PVSC Facilities on an As Needed Basis for a Two (2) Year Period
Term Contract
Post-Bid
Newark, NJ

Sally Port Door Replacement - Ann Klein Forensic Center
Results
Less than $965,941 est. value
Trenton, NJ 08618

Last Updated 05/27/2021 04:03 PM
Project Title

Window and Exterior Door Replacement of Buildings #4 and #12

Physical Address View project details and contacts
City, State (County) Sicklerville, NJ 08081   (Camden County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Windows to be replaced are: Fixed punched windows in corridor in front of Cafeteria (14 windows). Storefront window wall in Kitchen. Storefront Window in Bakery kitchen. Storefront window in 2 classrooms behind kitchen. Windows in classroom behind kitchen. Alternate 1 is to Provide the labor and material to remove and replace all exterior doors at Building 12 as shown on Drawings A-3, and A-4. Alternate 2 is to provide the labor and material to remove and replace all the windows at Building 12 as shown on Drawings A-3 and A-5. (C09) ELECTRICAL, (C008) GENERAL CONSTRUCTION OR (C009) GENERAL CONSTRUCTION/ALTERATIONS AND ADDITIONS, OR (C011) DOORS AND HARDWARE AND (C012) WINDOWS, C09 - Electrical

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents