Similar Projects
Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

South Aircraft Parking Ramp Pavement Rehabilitation - City of Fullerton
Alteration
Conception
Less than $2,200,000 est. value
Fullerton, CA 92833

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Orange High School 2-Story Classroom and Student Services Building
Addition, Demolition, New Construction, Infrastructure - 26,096 SF
Bidding
$5,000,000 CJ est. value
Orange, CA 92867

Superior Avenue Pedestrian / Bicycle Bridge and Parking Lot
New Construction, Infrastructure
Bidding
$9,970,000 CJ est. value
Newport Beach, CA 92663

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Modify Striping and Signs, Update Curb Ramps and Signals
Infrastructure
Post-Bid
$271,815 est. value
Fullerton, CA

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Results
$16,200,000 est. value
CA

San Clemente Campground Asphalt Repairs
Infrastructure
Results
$20,000 est. value
San Clemente, CA 92672

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Hicks Canyon Community Park Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Irvine, CA 92602

Last Updated 10/25/2022 12:03 AM
Project Title

Wilson Street Improvement Project

Physical Address View project details and contacts
City, State (County) Costa Mesa, CA 92627   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,795,391 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work generally consists of street improvements and signing and striping modifications along Wilson Street from Newport Boulevard to Placentia Avenue. Installation of new concrete curb ramps, concrete driveways, median islands, speed humps, traffic loop detectors, traffic and parking signs, pavement striping and markings, and slurry sealing of the streets are included. The number of working days will be FIFTY (50). For all inquiries, please contact Administrative Secretary: Janet Zuazo, Public Services Department, via e-mail at janet.zuazo@costamesaca.gov.A Payment Bond and a Performance Bond, each in the amount of 100% of the contract amount, will be required of the successful bidder prior to award of the contract.The City of Costa Mesa reserves the right, in its sole discretion, to reject any or all bids, or to waive any minor irregularities or informalities in any bid.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents