Similar Projects
Mesivta of Clifton Secondary School
Addition, Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Clifton, NJ 07014

Palestinian American Community Center
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Clifton, NJ 07011

Taco Bell Restaurant / Paterson
New Construction, Infrastructure - 1,679 SF
Design
$512,095 CJ est. value
Paterson, NJ 07501

LDS Meetinghouse / Passaic
New Construction, Infrastructure - 8,910 SF
Bidding
$4,000,000 CJ est. value
Passaic, NJ 07055

Post Brook Dam Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Ringwood, NJ 07456

On-Call Bridge and Culvert Repair Contract
Renovation, Term Contract, Infrastructure
Post-Bid
NJ

2022 Road Resurfacing Program
Infrastructure
Post-Bid
Wayne, NJ

Red Twig Trail Road Improvements
Results
$650,000 to $700,000 est. value
Bloomingdale, NJ 07403

Ward Street Parking Garage - General Construction
New Construction, Infrastructure
Results
$21,200,000 CJ est. value
Paterson, NJ 07505

Pedestrian Bridge for Hackensack Meridian Health Building
New Construction
Construction
$1,700,000 est. value
Clifton, NJ

NES Group Distribution Center Addition
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Clifton, NJ 07012

Commerce Way Flex Warehouse Building
New Construction, Infrastructure - 253,443 SF
Pending Verification
$27,000,000 CJ est. value
Totowa, NJ 07512

Impact Steel Totowa
Addition, Infrastructure - 1,767 SF
Design
$375,000 CJ est. value
Totowa, NJ 07512

Municipal Bus Shelters - Advertising Display Revenue Share
Infrastructure
Bidding
$50,000 CJ est. value
Clifton, NJ 07013

Concrete Restoration
Term Contract, Infrastructure
Post-Bid
Clifton, NJ

Last Updated 12/19/2022 11:03 AM
Project Title

Construction of the Morris County Greenway Peckman River Crossing Pedestrian / Bicycle Bridge - Passaic County

Physical Address View project details and contacts
City, State (County) Paterson, NJ 07505   (Passaic County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 29, 2022, an engineer has been selected for the project. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: Construction Engineering and Inspection Services for the Construction of the Morris County Greenway Peckman River Crossing Pedestrian/Bicycle Bridge in Township of Little Falls, Passaic County. This work shall include all necessary construction engineering and inspection services and Phase II Archaeological Investigation Services, under a single contract for the construction of the Morris Canal Greenway Peckman River Crossing Pedestrian / Bicycle Bridge in the Township of Little Falls, Passaic County (Structure 1600-517). The proposed bridge will be a single span of approximate 100' utilizing a pre-fabricated steel truss pedestrian bridge supported on concrete abutments. The estimated construction duration is 9 months. The estimated duration of time needed for the firm providing construction inspection is 11 months. No late proposals or bids will be accepted. The County is not responsible for bids delivered or otherwise not arriving on time. The County reserves the right to reject bids for the reasons stated therein. Board reserves the right to reject any and all proposals and waive minor informalities not considered material. If there are any questions regarding the bid opening process during the Public Health Emergency, please contact Passaic County Purchasing Department at bids@passaiccountynj.org. Jessica Kao, Assistant Purchasing Agent, Phone: (973) 247-3300, Email: Jessicak@passaiccountynj.org As of March 17, 2021 this project is seeking qualifications. Bidding for contractor and a firm construction timeline has not been determined at this time.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents