Similar Projects
2021 CDBG Wastewater Improvements
Renovation
Design
$6,000,000 CJ est. value
Morton, MS 39117

2021 CDBG Wastewater Improvements Project
Renovation
Bidding
$3,000,000 CJ est. value
Morton, MS 39117

Wastewater Treatment Facility (WWTF) Improvements Phase II
Renovation
Bidding
$300,000 CJ est. value
Saltillo, MS 38866

South Gulfport WWTP Clam Hoist
Post-Bid
Gulfport, MS 39503

Sewerage Pre-Treatment System
New Construction
Post-Bid
Meridian, MS

Metro Wastewater Treatment Plant Improvements
Renovation
Results
$10,631,000 est. value
Hernando, MS

Wastewater Treatment Upgrades - Boswell Regional Center
Renovation
Results
Magee, MS 39111

Utility Extension & Treatment Plant Expansion - HLRA - 11
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Moselle, MS

Wastewater Improvements at Hugh White State Park
Infrastructure
Results
Grenada, MS 38902

Wastewater Treatment Improvements
Renovation
Post-Bid
$200,000 CJ est. value
Tutwiler, MS 38963

Wastewater Treatment Facilities and Collection System Improvements
Renovation
Results
Marietta, MS

Sewage Treatment Plant Improvements
Renovation
Post-Bid
$325,000 est. value
Crowder, MS

Wastewater Facilities Improvements
Renovation
Results
Marks, MS

Durant CDBG 2021, Wastewater System Improvements
Infrastructure
Post-Bid
$3,000,000 est. value
Durant, MS

2021 Wastewater Treatment Plant Improvements, Phase 2
Renovation
Results
Cleveland, MS

Last Updated 08/26/2022 10:03 AM
Project Title

2021 Wastewater Collection System Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Winona, MS 38967   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,108,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Cleaning and CCTV of sanitary-sewer lines, smoke testing, manhole locates and inspections, assessment report, manhole lining and rehabilitation, installing cured in place pipe liners (CIPPL), by-pass pumping, manhole frame and cover adjustments and replacements, sanitary-sewer point repairs, and sanitarysewer installations. Sanitary-sewer lines investigated and rehabilitated will range form 6-inch to 24- inch. This project will prioritize the investigative phase first and then focus on the rehabilitation phase second with remaining project funds. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The successful bidder must comply with Section 3 of the Housing and Urban Development Act of 1968 (12 U.S.C. 1701u). CDBG regulations governing the grant require that, to the greatest extent feasible opportunities for contracting, subcontracting, training and employment arising in connection with this CDBG project will be extended to Section 3 businesses and Section 3 residents. Minority and Woman Owned Business Enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities, equipment, material and/or supply needs. The City of Winona is an Equal Opportunity Employer, and hereby notifies all bidders will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other legally protected status in consideration for an award. The successful bidder must comply with the Davis-Bacon Act which requires that all laborers and mechanics shall be paid at rates not less than those determined by the Department of Labor to be prevailing for the locality in which the project is located.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents