Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Construction of Wor-Wic Applied Technology Building
New Construction - 52,000 SF
Post-Bid
Less than $30,566,000 est. value
Salisbury, MD 21804

Construction of Wor-Wic Applied Technology Building
New Construction - 52,000 SF
Post-Bid
Less than $30,566,000 est. value
Salisbury, MD 21804

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Curb and Gutter Replacement
Results
Fruitland, MD 21826

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Post-Bid
$2,500,000 est. value

Asphalt Mill and Overlay
Results
Fruitland, MD 21826

North Parking Lot Resurfacing
Term Contract
Post-Bid
Salisbury, MD 21804

Mill, Grind, Patch and Resurface Roadway Pavements at Various Locations
Results
$5,000,000 to $10,000,000 est. value
MD

Hot Mix Asphalt Patching
Results
Less than $50,000 est. value
Salisbury, MD

2021 CDBG Church Street Doverdale Sidewalk Construction and ADA Upgrades
Results
Salisbury, MD 21801

Cabin 11 - Foundation Waterproofing, New Germany State Park, Garrett County
Results
Less than $50,000 est. value
Grantsville, MD 21536

Interstate 295 Miscellaneous Roadway Improvements
Results
$3,900,000 est. value
Wilmington, DE 19801

Riverwalk Polymer Modified Cementitious Overlay
Results
Salisbury, MD

Pavement Maintenance
Term Contract
Results

Reported 03/04/2022 12:00 AM
Project Title

Roadway and Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Salisbury, MD 21804   (Wicomico County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

consists of a roadway and parking lot expansion and upgrade that covers approximately 11 acres across the active campus. The Campus Improvement project includes an expansion of a staff/visitor parking lot adjacent to Brunkhorst Hall on western side of the campus and the upgrade of the main entrance to campus situated to the east of the existing traffic circle on Walston Switch Road. Lastly, the widening and extension of the Campus Loop Road coupled with the entry road improvements are designed to consolidate/improve movement across campus while also improving the safety of vehicular movements relative to pedestrian access. This work will be phased and happens on an occupied campus and will require coordination with the ongoing construction of the Applied Technology Building.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents