Similar Projects
Gravel Street Pump Station Electrical/Mechanical Upgrades
Bidding
Groton, CT

Plantsville Pump Station Rehabilitation Project
Renovation
Bidding
$825,000 est. value
Southington, CT 06489

Batterson Park Pump Station Upgrade
Renovation
Post-Bid
$1,700,000 est. value
Farmington, CT

Provision and Installation of a Prefabricated Pump Station
Post-Bid
Groton, CT 06340

WPCF Plant and Pump Station Fiber Connection Installation
Results
$50,000 to $130,000 est. value
Plainville, CT

Pump Stations Resiliency Implementation
Results
New Haven, CT

Construction of Stormwater Pumping Station, Stratford, CT
Post-Bid
$5,000,000 to $10,000,000 est. value
Stratford, CT

2020 Maintenance and Operation of Mansfield Pump Stations
Results
Mansfield, CT

Evergreen Avenue and Blue Hills Pump Stations HVAC Improvements
Post-Bid
Waterford, CT 06385

Wastewater Pump Stations Rehabilitation Project
Renovation
Results
Stafford, CT 06615

Reservoir Avenue and Old Town Road Pump Station Upgrades
Renovation
Post-Bid
Trumbull, CT 06611

James Street Siphon Station Upgrades Project
Results
New Haven, CT 06512

Woodbridge Lane, Ridgewood Acres and Woodbridge Lane Pump Station Reconstruction Project
Renovation
Results
$1,000,000 to $2,499,999 est. value
Thomaston, CT 06787

Steele Street Pump Station Modifications
Renovation
Results
Less than $443,700 est. value
New Britain, CT

Route 133 Pump Station Improvements
Results
Brookfield, CT

Last Updated 05/26/2020 09:22 AM
Project Title

Easton Turnpike Pump Station and Force Main Replacement

Physical Address View project details and contacts
City, State (County) Fairfield, CT 06824   (Fairfield County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified contractors to demolish and replace the Easton Turnpike Sewer Pump Station (Contract 1) and Easton Turnpike Pump Station Force Main (Contract 2) within the Fairfield sewer collection system.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents