Similar Projects
Rehabilitate Taxiway a, Phase 2 and Rehabilitate Taxiway B, Phase 1 at the Jackson-Aedgar Wiley Evers International Airport
Infrastructure
Design
$525,000 CJ est. value
Jackson, MS 39208

Rehabilitate Taxiway a, Phase 2 and Rehabilitate Taxiway B, Phase 1 at the Jackson-Aedgar Wiley Evers International Airport
Infrastructure
Design
$525,000 CJ est. value
Jackson, MS 39208

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Highway 80 Eastgate and Highway 80 Municipal Drive Signal and Intersection Improvements
Alteration
Post-Bid
Brandon, MS 39042

Annual Asphalt
Term Contract
Post-Bid
MS

2021 Roadway Sealing
Infrastructure
Results
Richland, MS

Brandon High School Parking Lot Rankin County School District-21
Infrastructure
Results
Brandon, MS 39042

Menasha Packaging Expansion
Addition, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Pelahatchie, MS 39145

Add Alternate Water Distribution System
Infrastructure
Design
$1,000,000 CJ est. value
Jackson, MS 39232

Asphalt Leveling and Patching
Term Contract
Post-Bid
MS

Pearl-Richland Intermodal Connector
Infrastructure
Results
$37,752 est. value
Pearl, MS 39288

Road Repair
Alteration
Post-Bid
Jackson, Pearl, MS 39208

Placement of Stripe and Raised Pavement Markers
Infrastructure
Results

Asphalt Paving, Asphalt Materials and Related Items
Infrastructure
Post-Bid
Brandon, MS

Aerosmith Drive/Leggett Drive Base Repair
Infrastructure
Results
Richland, MS 39218

Last Updated 12/28/2022 08:37 AM
Project Title

Pinehaven Curb Improvements and Street Overlay

Physical Address View project details and contacts
City, State (County) Flowood, MS 39232   (Rankin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $628,281 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing of all labor and materials and for the construction of that certain project designated as: CITY OF FLOWOOD PINEHAVEN CURB IMPROVEMENTS & STREET OVERLAY For questions related to the electronic bidding process, please call Central Bidding at 225-810-4814. The project scope includes, but is not limited to removing and replacing curb & gutter as shown on the plans, repairing base failures as shown on the plans or indicated by the Engineer, and milling and overlaying the existing street(s), minor grading and shaping of areas behind the curb, sodding and all other work required as shown on the Construction Plans and in the Contract Documents and Specifications. Bid Security in the amount of 5% of the bid must accompany each bid in accordance with the INSTRUCTIONS TO BIDDERS. The total Contract Time will be 90 consecutive calendar days with liquidated damages at $500.00 per consecutive calendar day thereafter. No prospective BIDDER/CONTRACTOR may withdraw his proposal within SIXTY (60) DAYS after the actual date of the opening thereof.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents