Similar Projects
Well and Septic Tank Phase Out Program
New Construction, Infrastructure
Bidding
FL

VWCA Irrigation Pump Stations No. 1 and 2 Bypass Piping Installation
Infrastructure
Bidding
The Villages, FL 32162

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

FB Potable Water Well 14
Results
Less than $264,480 est. value
Flagler Beach, FL 32135

Water Treatment Plant Diesel Pumps and Motors Replacement Project
Infrastructure
Bidding
$600,000 est. value
Panama City, FL 32404

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Well Drilling Services
Alteration
Bidding
Jacksonville, FL

Irrigation Well Replacement
Term Contract
Post-Bid
Land O' Lakes, FL 34639

DX38 Dynamometer Pump and Motor Replacement Coast Guard Engineering
Results
$45,000 est. value
Miami Beach, FL 33139

Purchase of Eight (8) Vertical Turbine Pumps
Infrastructure
Bidding
Vero Beach, FL

Well Pump Motor
Post-Bid
Plant City, FL 33564

Supply Berkeley Pump
Results
Tarpon Springs, FL 34688

Reported 02/08/2022 12:00 AM
Project Title

Well Drilling Services

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32212   (Duval County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Direct Push Drilling Services at the Naval Air Station (NAS) Jacksonville (Site) located in Jacksonville, FL. Up to four cores (2-inch diameter) drilled up to 30 feet per boring using a DPT rig with Geoprobe dual tube sampling methods or comparable will be required for the anticipated analyses. Borings will be located within approximately 2 feet of each other. Cores must be collected in liners. If a smaller diameter sample barrel is used, additional cores may be required.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents