Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Water Distribution System Replacement Project
Infrastructure
Bidding
$6,600,000 CJ est. value
Lewiston, CA 96052

Place AR Chip Seal with Replace Asphalt Concrete Surfacing
Infrastructure
Bidding
$2,320,000 CJ est. value
Hayfork, CA 96041

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

HMA overlay and replace AC surfacing
Infrastructure
Results
$780,000 est. value
CA

Roadway Excavation, Install Welded Steel Pipe and Alt. Pipe Culvert
Infrastructure
Results
$2,900,000 est. value
CA

Well 8 Project
Infrastructure
Bidding
$300,000 CJ est. value
Hayfork, CA 96041

Trinity High School Rehabilitation Increment 02 Ac Paving and Earthwork
Infrastructure
Post-Bid
$400,000 est. value
Weaverville, CA 96093

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

GAOA Rec Facilities Water Systems Upgrades, Six Rivers National Forest
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Eureka, CA 95501

Last Updated 11/25/2022 06:31 AM
Project Title

Struct Conc Bridge, Polyester Conc Overlay and Rock Slope Protection

Physical Address View project details and contacts
City, State (County) Hayfork, CA 96041   (Trinity County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,687,710 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Str conc bridge, polyester conc overlay & rock slope protection. 02-Tri-3, 299-VAR Project ID 0216000045 In Trinity County At Various Locations The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-12. 165 Working Day Submit your bid with bidder's security equal to at least 10 percent of the bid. CADOT - Struct Conc Bridge, Polyester Conc Overlay and Rock Slope Protection

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents