Similar Projects
Elevator Maintenance and Repair Services Annual Contract
Term Contract
Post-Bid
Jonesboro, GA 30236

Elevator Contract
Term Contract
Post-Bid
Fort Stewart, GA

Vertical Enclosed Carousel
Alteration
Results
Brunswick, GA

Elevator Preventive Maintenance and Repairs
Term Contract, Alteration
Results
$833,839 est. value
Atlanta, GA 30303

Elevator Repair Services Annual Contract
Term Contract
Post-Bid
Gainesville, GA

Refurbishment and Remodeling of the Annex 3 Elevator
Alteration
Results
Jonesboro, GA 30236

Elevator and Chairlift Maintenance and Repair Services
Term Contract
Post-Bid
Atlanta, GA

120 Courtland Building Elevator Modernization
Alteration
Results
$315,000 est. value
Atlanta, GA 30303

Inspection, Maintenane and Repair Services for Elevators and Lifts
Term Contract
Post-Bid
Conley, Forest Park, Lake City, Morrow, Rex, Riverdale, GA

Spalding County Courthouse Elevator System Modernization
Alteration
Results
Griffin, GA 30223

Replace Elevator In "D" Cell House Unit
Renovation, Demolition, Term Contract
Post-Bid
Atlanta, GA 30315

Elevator Inspection and Maintenance Services
Alteration
Results
$35,000 est. value
Columbus, GA 31906

Citywide Elevator Service, Repair and Maintenance
Alteration
Post-Bid
Atlanta, GA

Annual Contract for Elevator Maintenance
Term Contract
Post-Bid
GA

Elevator Inspection, Testing and General Repairs
Term Contract, Alteration
Post-Bid
Savannah, GA

Last Updated 09/28/2022 05:33 PM
Project Title

Elevator Maintenance Contract

Physical Address View project details and contacts
City, State (County) Griffin, GA 30224   (Spalding County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The needs of the preventative maintenance contract should include the following for examination: o Control and landing position systems o Signal fixtures o Machines, drives, motors, governors, sheaves, and ropes o Power units, pumps, valves, and mufflers o Document all work performed on maintenance tasks and records logs provided with each elevator. o Car and hoist way door operating devices and door protection equipment. o Load weighers, car frames, and counterweights o Safety mechanisms o Lubricate equipment for smooth and efficient performance. o Adjust elevator parts and components to maximize performance and safe operation. o Must inform staff prior to visit of date and time for maintenance review. o Staff must approve any extensive work completed on elevators. Questions due Monday, September 12, 2022 All questions regarding administrative issues must be in writing to the Public Works Consultant: Address: Mariza Eller Public Works Director City of Griffin P. O. Box T, Griffin, GA 30224 Email: meller@cityofgriffin.com The term of the maintenance agreement is for one year. The maintenance agreement will automatically renew at the 1-year mark and thereafter, unless prior written notice from either party is received 90 days prior to term ending. For any bid as required and noted in Section 1 of this bid document, a one hundred ten percent (110%) Performance bond and a one hundred ten percent (110%) Payment bond shall be furnished payable to, in favor of, and for the protection of the City. When Bid bonds are required, they must be in a sum equal to five percent (5%) of the total amount of the supplier's response and may be in the form of a surety issued bond or cashier's check made payable to the City of Griffin. Bid bonds are returned to the unsuccessful suppliers when the Notice of Award has been issued or contract has been executed. When bonding is required, failure to submit appropriate bonding will result in automatic rejection of bid. Performance and/or Payment bonds must be presented within ten (10) days of the Notice of Intent to Award or prior to the award of contract, whichever is later. Surety companies executing bonds must appear on the Treasury Department's most current publication (Circular 570 as amended) and be authorized to do business in Georgia. Unless otherwise specified, bonds shall be in effect for a period of one year from the completion of the project. The bond amounts shall be increased as the contract amount is increased. No alternative securities are currently accepted in lieu of performance or payment surety bonds. The City reserves the right to: reject any and all submittals received outside the time/place stated in the notice;

Details

Division 14 - Conveying Equipment, Operation and Maintenance of Conveying Equipment, Common Work Results for Conveying Equipment, Commissioning of Conveying Equipment, Elevators, Escalators and Moving Walks, Escalators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents