Similar Projects
Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Cove at Kettlestone - Lots 2 & 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Waukee, IA 50263

Ashley Acres
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Waukee, IA 50263

3rd Street Elevated Storage Tank Replacement
Infrastructure
Bidding
$900,000 CJ est. value
Waukee, IA 50263

RFQ Contractor - Dallas County Admin Building - BP-05.01 Structural Steel & Misc Metals
Demolition, New Construction, Infrastructure
Bidding
$1,800,000 CJ est. value
Adel, IA 50003

New Concessions Building - General Construction , Mechanical and Electrical
New Construction, Renovation, Infrastructure
Post-Bid
$800,000 CJ est. value
Van Meter, IA 50261

RFQ Design - Satellite Maintenance Facility at 170th Street and Waterford Road
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Waukee, IA 50263

2020 Downtown Street and Utility Improvements
Infrastructure
Results
Perry, IA

North West Meredith Drive Overlay
Infrastructure
Results
$645,407 est. value
Waukee, IA

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

James Pointe Plat 3 Lot 1 (Troy Plex)
New Construction, Infrastructure - 46,800 SF
Design
$5,000,000 CJ est. value
Waukee, IA 50263

RFQ Contractor - Dallas County Admin Building -BP-03.01 Structural Concrete
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Adel, IA 50003

Last Updated 04/12/2023 10:03 AM
Project Title

Rippey Water Main Replacement And Linden Water Main Replacement

Physical Address View project details and contacts
City, State (County) Bouton, IA 50039   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $858,773 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Time for Commencement and Completion of Work. Work on the improvement shall commence within 10 days of the date specified on the Notice to Proceed. Notice to Proceed shall be no later than May 19, 2023, Rippey Water Main Replacement Milestone shall be completed on or before July 28, 2023, all work shall be substantially complete on or before November 17, 2023, and all work shall be fully completed on or before May 3, 2024. Damages in the amount of Five Hundred ($500) dollars per day will be assessed for each day the work remains incomplete after the Milestone and Substantial Completion times and Five Hundred ($500) dollars per day will be assessed for each day the work remains incomplete after the Final Completion time. Bid Security. Each bidder shall accompany its bid with bid security, as defined in Section 26.8 of the Iowa Code in an amount equal to Five (5%) percent of the total amount of the bid. Public Hearing on Proposed Contract Documents and Estimated Costs for Improvement. A public hearing will be held by the Board of Directors of the Xenia Rural Water District on the proposed contract documents(plans, specifications and form of contract) and estimated cost for the improvement at its meeting at 5:00 p.m. on April 20, 2023 in the Xenia Rural Water District Office, 23998 141st Street, Bouton, IA 50039 Rippey Water Main Replacement: Installation of approximately 305 linear feet of new 6-inch water main, including associated fittings, valves, hydrants, service reconnections, connections to existing water main, and surface restoration. Linden Water Main Replacement: Installation of approximately 3,200 linear feet of new 6-inch, 4-inch, and 2-inch water main, including associated fittings, valves, hydrants, service reconnections, connections to existing water main, and surface restoration. The Xenia Rural Water District reserves the right to reject any and all bids

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents