Similar Projects
MDOC Lakeland Correctional Facility - HVAC Systems Upgrade
Renovation
Results
$8,891,214 CJ est. value
Coldwater, MI 49036

RFP Design - Michigan Reformatory - Building Demolitions
Demolition, Infrastructure
Post-Bid
$190,000 CJ est. value
Ionia, MI 48846

Housing Unit A Medical Wing Upgrades
Renovation
Bidding
$750,000 CJ est. value
Ionia, MI 48846

McCoy Gun Range Improvements
Demolition, Renovation, Infrastructure
Bidding
$156,000 CJ est. value
Jackson, MI 49201

Food Service Flooring and Shower Upgrades - Parnall Correctional Facility
Renovation
Post-Bid
$370,000 CJ est. value
Jackson, MI 49201

Video Management System Upgrade - Phase 1
Renovation
Results
$3,013,620 CJ est. value
Jackson, MI 49201

SMT Parnall Various Housing Units Water Infrastructure Repairs and SMT Parnall Food Service Flooring and Shower Upgrades
Renovation
Results
$2,339,900 CJ est. value
Jackson, MI 49201

Charles E. Egeler Reception and Guidance Center Various Safety Improvements
Renovation
Bidding
$112,000 CJ est. value
Jackson, MI 49201

Kent County Correctional - Cell Door Replacement B3 D2 D3
Renovation, Alteration
Results
Grand Rapids, MI

RFP Design - Women's Huron Valley Correctional Facility (WHVCF) Power Plant Building - Phase 1 Boiler Replacements
Renovation
Post-Bid
$215,000 CJ est. value
Ypsilanti, MI 48197

Last Updated 01/05/2023 01:37 AM
Project Title

Thumb Correctional Facility - PPD System Replacement Phase 1

Physical Address View project details and contacts
City, State (County) Lapeer, MI 48446   (Lapeer County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,699,861 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a new fire alarm system for the correctional facility. The scope of work includes, but it's not limited to, the provision of a new system and devices, as well as the demolition of the existing system and its associated devices, wires, and equipment in all buildings. Conduits may be reused if recessed in walls but shall be replaced in exposed areas or as required. If any underground work is required, the contractor shall provide a GPR report before commencing any work. LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Sharon Frost at email address: FrostS1@michigan.gov. The email "Subject" must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). An individual is only permitted to represent one bidder at a mandatory walk-through. 5% Bid Security: Required 1. Any individual inside a state building must wear a face mask, irrespective of vaccination status. This applies in all State owned and leased facilities throughout the State of Michigan, including all common areas such as areas where individuals are waiting to enter a facility, cubicles, offices, conference rooms, elevators, stairwells, kitchens, bathrooms, and hallways. 2. Any individual outside a state office building must wear a face mask if social distancing cannot be maintained. 3. Requirements may change at any time and any updated guidance must be followed to be allowed to attend any meetings and for a firm to be eligible to submit bids / quotations / proposals. 4. Bring and be prepared to wear a mask if required upon arrival. ACCEPTING QUESTIONS UNTIL: November 2, 2022 by 2 p.m. Work Description - The Work, PPD System Replacement Phase 1, Agency No. 472, DTMB File No. 22255.MAA includes, but is not necessarily limited to: purchase and installation of the Real Time Location System (RTLS) from Guard1, raceway, cabling, fiber, network hardware, programming, system configuration and commissioning etc. for a complete and operational system. Provide all labor and materials to necessary to power the PLTs hardwired, blue lights for the hard-of-hearing group - per PREA requirements, and new speakers to be connected to the PPD system. The site is located at 3225 John Conley Dr, Lapeer, MI 48446

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents