Similar Projects
Last Updated | 08/05/2023 10:11 PM |
Project Title | North Rd IRA - Interior Paint |
Physical Address | View project details and contacts |
City, State (County) | Waterloo, NY 13165 (Seneca County) |
Category(s) | Single Trades |
Sub-Category(s) | Painting |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $35,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Interior Painting of the first floor of the residence with wallpaper removal. SCOPE OF WORK includes, but is not necessarily limited to the following: Complete Interior painting of residence; Walls, Ceilings, Closets, Doors, Base and Trim, etc. The wallpaper will be removed from all surfaces before painting. 1. Price quote shall include all materials (paint, stain, necessary tools and accessories) and labor. 2. Wallpaper will be removed from all surfaces and imperfections repaired before painting. 3. Paint, stain and other finishes must be a SHERWIN WILLIAMS product selected from the DDSO color chart by House Director or Maintenance Supervisor/Designee. The colors chosen for common areas (kitchen, dining, rec rooms, hallways, etc.) must be neutral colors. 4. Paint used in bathrooms shall include a mold inhibitor. 5. Ceiling paint shall be a flat finish, except in Bathrooms/Kitchens where a semi-gloss finish should be used. 6. Paint used on walls and trim must be a semi-gloss finish. 7. A clear satin low VOC coating to be applied to all-Natural Wood trim and doors. 8. Any stains on ceilings and walls shall be primed, with a stain killing primer to prevent bleed-through of topcoat. 9. All surfaces shall have two (2) coats of paint minimum; three (3) or more, if necessary, for complete coverage, same for varnish's if applicable. 10. Apply paints and stains by brush and roller only, per the manufacturer's written instructions. Use primer as recommended by manufacturer. 11. Use drop cloths to cover stationary furniture, flooring, appliances, etc Work must be started and/or completed within 60 days of receiving the purchase order. Questions deadline: 7/18/23 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |