Similar Projects
Lafortune Park Case Tennis Center
New Construction
Conception
Tulsa, OK

Roll-Em-Up Taquitos
New Construction - 1,700 SF
Conception
$500,000 to $1,000,000 CJ est. value
Tulsa, OK

Mingo 20
New Construction
Design
Tulsa, OK 74127

Dunkin Donuts
New Construction
Design
Tulsa, OK 74127

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Pavement Striping
Infrastructure
Results
Owasso, OK 74055

River West Park Improvements
Renovation
Results
Tulsa, OK

Arby's
Renovation
Construction
Tulsa, OK 74115

Arby's
Renovation - 2,200 SF
Construction
Tulsa, OK 74137

North of Market ( NOMA) - Mixed Use Development
New Construction, Demolition - 463,381 SF
Pending Verification
$60,000,000 est. value
Tulsa, OK 74129

North of Market ( NOMA) - Mixed Use Development
New Construction, Demolition - 463,381 SF
Pending Verification
$60,000,000 est. value
Tulsa, OK 74129

Nashbird Chicken Restaurant
New Construction - 2,550 SF
Conception
$500,000 to $1,000,000 CJ est. value
Tulsa, OK

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

Interior Construction Remodel
Renovation
Post-Bid
Sand Springs, OK

Last Updated 03/08/2023 03:58 PM
Project Title

2023 Bond - Union Public Schools

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74103   (Tulsa County)
Category(s) Commercial, Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Elementary School, Food/Beverage Service, Middle/Senior High School, Office, Park/Playground, Paving/Reconstruction, Site Development, Swimming Pool(s), Theaters/Auditoriums
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $152,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is part of the $152 million bond that was approved by the voters and passed. As of March 8, 2023, further details regarding design and construction timelines have not been identified. One of the signature projects in the bond is to "significantly reconfigure" its 6th and 7th grade building to ease students' transition from elementary school to middle school. The full list of inclusions on the bond include: (provided by Union Public Schools) Interior/Exterior Renovations: An estimated $46 million of the bond will go toward building interior and exterior renovations to include HVAC, roof replacements, safety and security upgrades, utility systems, paving, playgrounds, flooring, painting, windows, doors, millwork, lighting, furniture, fixtures, and equipment at sites throughout the district. Safety & Security: Extensive changes are planned throughout the district, including: The deployment of additional security cameras, door prompt sensors and other enhancements. At Jarman Elementary, the entrance and front office will be renovated to upgrade security. A new gym at the 6th /7th Grade Center will be a hardened facility to withstand tornado-strength winds and will also serve as the new home of Union's spirit and winter guard programs. Air quality in buildings will be heightened considerably through roof and HVAC changes; and playground and sidewalk updates will improve child safety; and A fire-retardant curtain will be installed at the High School studio theater in the event of a fire. Technology, textbooks, digital curriculum, and instructional resources will represent a $31 million investment. Union will continue to fund "1-to-1" (one computer device for every student), as it proved especially critical during the pandemic; the district will enter phase 2 of the program, replacing older laptops. This category includes the purchase of laptops, iPads, software, licenses, copiers and assorted hardware, as well as textbooks and instructional resources. In addition, each Union site and department would also receive an allocation, some of which may fall in this category. Athletics & Fine Arts Facility Upgrades: Student participation in extracurricular activities continues to skyrocket, which bolsters Union's graduation rate. Projects will include: Renovation of the Performing Arts Center's aging "back of house" (dressing room areas) and orchestra pit, new orchestra shell and the installation of new intelligent light system. Uniforms, equipment, technology and musical instruments for Athletics and Fine Arts. UMAC improvements to include a higher-resolution video/score board, sound system, sport lighting and exterior renovations. New gym and practice facility at the Union 6th/7th Grade Center. Resurfacing of tennis courts and turf replacement at the soccer practice and regular fields at the 8th Grade Center, the indoor baseball/softball practice facility and at the High School track; and Pool upgrade at the Sixth/Seventh Grade Center.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating, Fixed Audience Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Theatrical Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Electronic Digital Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents