Similar Projects
Utility Improvements for the Light Farms Laurel Phase II Neighborhood
Infrastructure
Bidding
$1,268,073 est. value
Celina, TX

SH 5 Utility Relocations
Infrastructure
Bidding
$650,000 est. value
Melissa, TX 75454

Utility Improvements for Inspiration, Phase 8A
Post-Bid
TX

Phase 4A/4C - Utilities Package for Bridgewater
Post-Bid
TX

Central Business District (CBD) at the DART Railroad Sanitary Sewer Rehabilitation Project
Results
Less than $700,000 est. value
Allen, TX 75013

Wilson Creek RWWTP Plant Drain Improvements
Results
$3,860,000 est. value
Allen, TX 75002

Donnie Mayfield Way
Infrastructure
Bidding
$250,000 est. value
Frisco, TX 75035

Travis Ranch Phase 2K Utility Improvements
Post-Bid
Dallas, TX

Blue Ridge Sanitary Sewer Replacements
Results
Less than $418,000 est. value
Blue Ridge, TX

Five-Mile Creek Wastewater Pipe Replacement
Alteration
Post-Bid
Dallas, TX

Offsite Utility Improvements to Serve Elevon, Phase 1A and 1B
Results
Lavon, TX

Sanitary Sewer Manhole Lining Project 2021
Infrastructure
Post-Bid
Plano, TX

Lower Panther Creek Wastewater Trunk Main
Results
$750,000 to $1,200,000 est. value
Frisco, TX 75034

Utility Improvements for Inspiration, Phase 8B
Infrastructure
Post-Bid
TX

Beech Street Improvements
Results
Less than $333,000 est. value
Celina, TX

Reported 05/20/2022 12:00 AM
Project Title

Upper East Fork Interceptor System Bypass Connection & Phase II Valve Improvements

Physical Address View project details and contacts
City, State (County) TX   (Collin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $2,732,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a municipal facility in Wylie, Texas. Completed plans call for site work for a municipal facility. The North Texas Municipal Water District is soliciting bids for the Upper East Fork Interceptor System Bypass Connection & Phase II Valve Improvements. Questions Due Date: Apr 29th 2022, 10:00 AM CDT The work covered by this item consists of bypass pumping operations in order to temporarily reroute sewer flows to prevent a sanitary sewage overflow (SSO) and to provide adequate and reliable sewer flow at all times during construction, while the tasked scope of work is executed. This item includes all requirements for implementing a temporary pumping system for the purpose of diverting sewage flow around any construction-related activity to an approved reintroduction point within the sanitary sewer system. The Contractor shall minimize the health, safety, and regulatory risks by taking all reasonable measures to avoid an SSO. Therefore, North Texas Municipal Water District requires the Contractor to manage the flow of wastewater in a planned and proactive manner. Suction piping location vents with HEPA filters will be required at manholes upstream and downstream of project area. It is expected that sound attenuation be used to maintain construction noise/pump noises below 70 db. reroute sewer flows to prevent a sanitary sewage overflow (SSO) and to provide adequate and reliable sewer flow at all times during construction, while the tasked scope of work is executed. This item includes all requirements for implementing a temporary pumping system for the purpose of diverting sewage flow around any construction-related activity to an approved reintroduction point within the sanitary sewer system. The Contractor shall minimize the health, safety, and regulatory risks by taking all reasonable measures to avoid an SSO. Therefore, North Texas Municipal Water District requires the Contractor to manage the flow of wastewater in a planned and proactive manner. Suction piping location vents with HEPA filters will be required at manholes upstream and downstream of project area. It is expected that sound attenuation be used to maintain construction noise/pump noises below 70 db.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents