Similar Projects
Women's Baseball Center Museum - City of Rockford
New Construction, Infrastructure
Conception
$7,000,000 CJ est. value
Rockford, IL 61101

Well 45 Reservoir Reconstruction - City of Rockford
Infrastructure
Conception
$15,000,000 CJ est. value
Rockford, IL 61102

Alpine Dam Modernization Phase 2 - City of Rockford
Infrastructure
Design
$22,400,000 CJ est. value
Rockford, IL 61101

Colman Yards Barber Colman Mixed-Use Development
New Construction, Infrastructure, Build-out - 130,000 SF
Design
$400,000,000 CJ est. value
Rockford, IL 61101

Parking Lot Crack Filling, Seal Coating, and Striping
Infrastructure
Post-Bid
Rockton, IL 61072

Gym Floor Asbestos Abatement
Term Contract, Infrastructure
Post-Bid
$121,000 CJ est. value
South Beloit, IL 61080

Cargo/Distribution Facilities Developer RFQ
Renovation
Results
Rockford, IL

1.86 Miles Stephenson County Line to 0.2 Miles W of Pecatonica Rd Smart Overlay With Longitudinal Joint Repair
Infrastructure
Results

Hard Rock Casino
Demolition, New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Rockford, IL 61108

Fleet Farm Retail Development
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Rockford, IL 61112

NorthPointe Birth Center
New Construction, Infrastructure - 8,700 SF
Pending Verification
$5,115,937 CJ est. value
Roscoe, IL 61073

ENGIE Solar Farm
Infrastructure
Conception
$5,000,000 CJ est. value
Rockford, IL 61108

Harlem High School Addition - Harlem Consolidated School District #122
Addition, Demolition, Infrastructure - 27,000 SF
Design
$13,500,000 CJ est. value
Machesney Park, IL 61115

2022 Pavement Improvement Project
Infrastructure
Post-Bid
$410,000 CJ est. value
Machesney Park, IL 61115

Hononegah High School Tennis Courts Expansion
Renovation, Infrastructure
Results
Rockton, IL 61072

Last Updated 07/13/2023 09:15 AM
Project Title

City Wide Sidewalk and ADA Repairs Package #2

Physical Address View project details and contacts
City, State (County) Rockford, IL 61101   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $64,229 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

NOTES: Last day for questions is July 6, 2023 at 12:00pm Answers to questions will be posted on the City's website in the form of an addendum no later than July 7, 2023 at 5:00pm Bid Bond When required on the cover sheet, a bid bond for not less than five (5) percent of the bid amount must accompany all bids as a guarantee that if the bid is accepted, the bidder will execute and file the proper contract. A bank cashier's check, bank draft, or certified check equal to the amount specified is acceptable in lieu of a bid bond. Bid bonds of the two lowest firms will be retained until the contract is awarded. Performance and Payment Bond. When required by the specifications herein, the awarded vendor shall furnish a performance and payment bond equal to the amount of the contract, acceptable to the City, within fourteen (14) calendar days after notification of contract award. Failure to furnish the required bond within the time specified may be cause for rejection of the bid and any bid deposit may be retained by the City as liquidated damages and not as a penalty. Withdrawal of Bids. Firms may withdraw or cancel their bids at any time prior to the advertised invitation to bid opening. After the opening time, no bid shall be withdrawn or cancelled. All bids shall be firm and valid for a period of sixty (60) calendar days. If a bidder to whom a contract is awarded refuses to accept the award, the City may, at its discretion, suspend the bidder for a period of time up to three (3) years The City of Rockford reserves the right to accept or reject any and all proposals and to waive technicalities

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents