Similar Projects
Construction of Ductwork Modifications
Bidding
Greensboro, NC 27411

High Point Mental Health HVAC Renovations
Bidding
Greensboro, NC 27401

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Diagnostic and Emergency Repair Services for Residential Dwellings
Term Contract
Post-Bid
High Point, NC

AHU, VAV/DDVAV and Controls Upgrade - Phase 1 Dowdy Administration Building
Results
Greensboro, NC 27400

Southwest Guilford High School - HVAC Renovation
Results
High Point, NC

Northwest High Gym AC
Bidding
Greensboro, NC 27409

Dundas Circle HVAC Renovations
Post-Bid
Greensboro, NC 27407

Solicitation/RFO Announcement for the FAA Eastern Acquisition Service Area, Boston Acquisition Office, has a New Construction Requirement for the GSO ASR Fiber Optic Project in Greensboro, NC.
Results
$750,000 to $1,000,000 est. value
Greensboro, NC

HVAC Maintenance and Repair Services
Post-Bid
High Point, NC 27260

Chiller Internal Inspection
Results
Greensboro, NC

JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

Air Conditioner RTU
Results
Greensboro, NC

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

HPRH Kitchen Hood Replacement
Results
High Point, NC 27262

Reported 01/23/2019 12:00 AM
Project Title

High Point Social Services Phase I - Unit AC 2

Physical Address View project details and contacts
City, State (County) High Point, NC 27260   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Providing services for the HVAC renovations at High Point Social Services. The contractor is to provide all required labor, tools, material and equipment for the selective demolition of existing HVAC equipment, piping, and ductwork, and install new equipment with integral microprocessor controls, piping, and ductwork. The base bid work includes, but is not limited to: 1. Removal of existing split-system air handling unit with electric heat, duct connections, electrical connections, and refrigerant piping. 2. Removal on existing roof-mounted split-system heat pump with electrical connections and refrigerant piping. 3. Removal of miscellaneous supply and return ductwork. 4. Installation of one (1) new split-system air handling unit with electric heat with duct connections, power and control wiring, refrigerant piping, condensate piping, and related accessories. 5. Installation of one (1) new roof-mounted split-system heat pump with power and control wiring, refrigerant piping, and related accessories. 6. Install of new outside duct and modulating damper with CO2 sensor. 7. Installation of miscellaneous supply and return ductwork with grilles. 8. Testing, balancing, adjusting, and commissioning of the split-system heat pump and air distribution. 9. Repair and restoration of the building to original or better condition at the completion of the project.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents