Similar Projects
Multi-Agency Law Enforcement Training Center
New Construction
Conception
Nashville, TN

New Fire Station - 18FD0001 - City of Nashville
New Construction
Conception
$48,000,000 est. value
Nashville, TN 37204

Multi-Agency Law Enforcement Training Academy
New Construction
Design
Nashville, TN

Fire Station One Renovations - City of Columbia
Renovation
Design
$1,000,000 CJ est. value
Columbia, TN 38401

RFP - Purchase and/or Redevelopment of the Old Fire Station No. 4
Demolition, New Construction, Infrastructure
Bidding
$1,600,000 CJ est. value
Morristown, TN 37814

Fire Station 1
Renovation
Post-Bid
Hendersonville, TN 37075

Fire Station Annex Building
New Construction
Post-Bid
$738,691 est. value
Gilt Edge, TN 38015

Campbell County Sheriffs - Office Building
New Construction
Results
Jacksboro, TN 37757

2 Bay Extension On Garage
Addition
Results
Gallatin, TN 37066

Kingsley Place
New Construction, Infrastructure - 68,871 SF
Pending Verification
$200,000,000 CJ est. value
Spring Hill, TN 37174

Police Training Complex Upgrades - City of Johnson City
Renovation
Conception
Less than $700,000 est. value
Johnson City, TN 37604

TN Fire Training Academy Residential Burn Building
New Construction, Infrastructure
Design
$1,720,000 CJ est. value
Bell Buckle, TN 37020

Bartlett PD Backup PSAP
Renovation
Post-Bid
Bartlett, TN 38135

MPD Communication Radio Maintenance Phase 1
Renovation
Results
$750,000 est. value
Memphis, TN 38104

Fire Station Improvements - City of Johnson City
Renovation
Conception
$500,000 est. value
Johnson City, TN 37601

Last Updated 09/26/2022 04:09 PM
Project Title

Metro Nashville Police Department Substation

Physical Address View project details and contacts
City, State (County) Nashville, TN 37203   (Davidson County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for an addition and alterations. This project is scheduled to go before the Metro Development and Housing Agency Design Review Committee on October 4, 2022. An architect has been selected; however, a general contractor or selection method is not disclosed. A timeline for construction has yet to be announced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents