Similar Projects
Hopewell Park - Phase 1 Landscaping Project
Bidding
Center Valley, PA 18034

2021 Fertilize, Weed Control, and Pest Control Project
Bidding
Center Valley, PA

Turf Materials
Post-Bid
Allentown, PA

Grass Cutting Services
Term Contract
Post-Bid
Bethlehem, PA 18017

Pesticide/Herbicide for Spotted Lanternfly
Term Contract
Results

Herbicides (Supplement)
Term Contract
Post-Bid

Landscape Maintenance
Post-Bid
Bethlehem, PA 18017

Lawn Mowing Services
Post-Bid
Bethlehem, PA 18015

Certified Playground and Forever Brown Mulch
Post-Bid
Allentown, PA 18104

Landscaping Enhancements/Awning Installation
Post-Bid
Allentown, PA 18102

Walnut Manor Landscape Enhancements
Renovation
Post-Bid
Allentown, PA 18102

Mist Spray Competing Vegetation
Post-Bid

Tree Services
Post-Bid
Macungie, PA 18062

Cotton Street Rain Garden
Post-Bid
Macungie, PA 18062

Utility Easement Maintenance
Term Contract
Post-Bid
Allentown, PA

Last Updated 02/04/2020 01:04 AM
Project Title

Field Irrigation System Repair Project at Coca-Cola Park

Physical Address View project details and contacts
City, State (County) Allentown, PA 18109    (Lehigh County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing 1400 LF of mainline irrigation loop and control wiring. Install 1400 LF of 3 IN HDPE DR 13.5 mainline irrigation loop. Connect 3 IN HDPE DR 13.5 main line irrigation loop to existing 14 electric valves, eight quick coupler connections, one connection to bullpen irrigation and one connection to lawn batters eye. Install 1500 LF of new control wire along main irrigatinon line. Connect to all 14 electric valves and irrigation controller Backfill around irrigation pipe with a sand or fine gravel to cover the pipe. Backfill with existing stone up to four inches below grade. Backfill to be installed at 8 IN lifts and compacted with vibratory plate. Plywood to be placed alongside trench to prevent contaimination. Backfill last four inches with warning track material and compact. Warning track material must match existing, is called 3/16 red warning track and is available from Partec Peat.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents