Similar Projects
South Cairns Development
New Construction
Conception
Sandy, UT 84070

Conference Hotel (MWR Facility ) at Mayflower Mountain Resort
New Construction - 615,055 SF
Design
Park City, UT 84060

Williamsburg Apartments - 64 PLEX - Building B
New Construction - 59,508 SF
Design
$12,000,000 est. value
North Salt Lake, UT 84054

DFCM Construction-Bear Lake SP Rendezvous Beach Restroom Improvement
Bidding
$1,200,000 est. value
Laketown, UT 84038

LDS Relief Society Building Restroom
Renovation, Addition
Post-Bid
Salt Lake City, UT 84150

Two-Phase Design-Build Ground Based Strategic Deterrent Mission Integration Facility (GBSD)
New Construction - 140,000 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Ogden, UT 84056

Montview Park Restroom Expansion Project
Results
Cottonwood Heights, UT

DFCM Construction-Pre Qualified General-Veterans Affairs Site Improvements Restrooms
Results
Less than $72,500 est. value
Bluffdale, UT

Paxton 365 Apartments
New Construction - 117,702 SF
Construction
Salt Lake City, UT 84101

800 Block Student Housing
New Construction - 217,866 SF
Construction
$10,000,000 CJ est. value
Logan, UT 84321

Porter's Place Condominiums
New Construction - 8,145 SF
Pending Verification
Tooele, UT 84074

Williamsburg Apartments - 64 PLEX - Building C
New Construction - 59,508 SF
Design
North Salt Lake, UT 84054

Kane County Restroom Facility
Post-Bid
Kanab, UT 84741

Equestrian Park Restroom and Shower Building
New Construction
Results
$250,000 to $300,000 est. value
South Jordan, UT 84095

Smith's Store #94 Parking Deck Demolition
Renovation, Demolition - 172,569 SF
Construction
Salt Lake City, UT 84102

Last Updated 04/25/2019 12:23 PM
Project Title

Payson Bus Compound (Parking Lot and Building)

Physical Address View project details and contacts
City, State (County) Payson, UT 84651   (Utah County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Parking Garage, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construction of a new parking lot and building at the Payson Bus Compound.
Details 1 Restroom/Bath House, 1,600 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents