Similar Projects
Babcock Trail Apartments
New Construction - 67,766 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Inver Grove Heights, MN 55077

Warehouse Building Storage & Parking
New Construction - 70,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Rosemount, MN 55068

Ardan Place Housing Development
New Construction
Design
Rosemount, MN 55068

Vermillion Acres Senior Living
New Construction - 99,300 SF
Design
$30,000,000 est. value
Hastings, MN 55033

South Saint Paul Library
New Construction, Infrastructure - 16,200 SF
Bidding
$7,000,000 CJ est. value
South Saint Paul, MN 55075

Ipava Avenue and 165 th Street W Mill and Overlay Project
Infrastructure
Bidding
$450,000 CJ est. value
Lakeville, MN 55044

Saint Croix Bluffs Regional Park - Conference Cottage Demolition
Demolition, Infrastructure
Sub-Bidding
$95,000 CJ est. value
Hastings, MN 55033

Thompson County Park General Site Improvements
Post-Bid
$1,400,000 est. value
West Saint Paul, MN 55118

Agricultural Lab Building Infrastructure Improvements
Renovation, Alteration
Post-Bid
$19,126,000 est. value
Saint Paul, MN 55155

NSC Loading Dock Replacement
Results
$150,000 est. value
West Saint Paul, MN 55118

Spring Lake Park Reserve Ravine Stabilization
Infrastructure
Results
Rosemount, MN 55068

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Quality One Woodwork Expansion
Addition - 50,000 SF
Pending Verification
Hastings, MN 55033

Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

Last Updated 08/02/2022 08:05 AM
Project Title

Launch Park Lakeville

Physical Address View project details and contacts
City, State (County) Lakeville, MN 55044   (Dakota County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $140,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans are still underway but could include any of the following for warehouse, distribution and manufacturing uses: Six buildings totaling 997,000 square feet. Seven buildings totaling almost 1.3 million square feet. Three buildings totaling 582,000 square feet. As of August 2, 2022, this project is in the early planning stages, and is seeking approvals from the City of Lakeville. Information regarding the selection of an architect and general contractor has not been provided. Construction is anticipated to start in 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1,300,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents