Similar Projects
Walmart Supercenter #5389-251 - D80 BLST CHIL
Renovation - 208,418 SF
Design
Waco, TX 76643

Walmart Supercenter #4115-232 - D80 BLST CHIL
Renovation - 186,933 SF
Design
Cibolo, TX 78108

Road Ranger #285 / Seguin
New Construction, Infrastructure - 12,676 SF
Bidding
$2,100,000 CJ est. value
Seguin, TX 78155

Road Ranger #285 / Seguin
New Construction, Infrastructure - 12,676 SF
Bidding
$2,100,000 CJ est. value
Seguin, TX 78155

School of Science and Technology - Schertz Phase 2
New Construction, Infrastructure
Sub-Bidding
$4,940,038 CJ est. value
Selma, TX 78154

Walmart 0-3--TENANTBID--2021 - Bundle #3
Renovation
Post-Bid

Walmart Supercenter #901-605 - CAPXREF-2
Renovation
Post-Bid
Seguin, TX

Seguin Police Department Parking Lot Improvements
Infrastructure
Results
$455,000 CJ est. value
Seguin, TX 78155

Walmart Supercenter #901-249 - CSP
Renovation - 172,005 SF
Construction
$407,570 est. value
Seguin, TX 78155

Tractor Supply
Renovation - 26,681 SF
Construction
Seguin, TX 78155

Starbucks - I-35 & North Walters Street
New Construction, Infrastructure - 2,556 SF
Pending Verification
$474,450 CJ est. value
Schertz, TX 78154

Fouroaks- Murdochs
Renovation - 2,897 SF
Pending Verification
$150,000 est. value
Schertz, TX 78154

Walmart Supercenter #3391-260 - D80 BLST CHIL
Renovation - 203,091 SF
Design
Schertz, TX 78154

5720 IH 10 12" Waterline Extension
Infrastructure
Bidding
$187,500 CJ est. value
Marion, TX 78124

Walmart Supercenter #163-607 - CAPXHVAC-3
Renovation
Post-Bid
Nacogdoches, TX 75965

Last Updated 08/09/2022 04:01 PM
Project Title

Buffalo Heights Retail Shell Site Work and Utility Improvements

Physical Address View project details and contacts
City, State (County) Cibolo, TX 78108   (Guadalupe County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Retail, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $11,209,206 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 9, 2022, plans have been submitted for permitting. A general contracting method has not been disclosed. Construction is expected to begin September 2022 and be completed September 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

68,876 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents