Similar Projects
Multi-Purpose Sport Flooring at Horizon Middle School
Bidding
Kissimmee, FL 34746

Office Flooring Removal and Replacement
Bidding
Tampa, FL

Neal Armstrong Elementary School - Kitchen Floor Replacement
Sub-Bidding
Port Charlotte, FL 33952

2019 Gym Floor Refinish and Restoration
Post-Bid
Tampa, FL 33610

M.C Blanchard Judicial Building Carpet Replacement
Post-Bid
Pensacola, FL 32502

Public Safety Building Repairs
Results
Less than $10,100 est. value
Callaway, FL 32404

Replace the Flooring for the Wewahitchka High School Commons Area
Results
Wewahitchka, FL 32465

Raised Flooring System with Carpet
Bidding
Hurlburt Field, FL

Composite Coat Floors and Containment Basins at Water/Wastewater Plants
Post-Bid
Less than $750,000 est. value
Tampa, FL 33601

Replacement of Volusia County Fire Stations Concrete Floor Coatings
Results
Less than $32,895 est. value
De Land, FL 32720

Pahokee High School Gymnasium Floor Replacement
Bidding
Pahokee, FL 33476

Miramar Town Center Building W 2nd Floor Flooring Project
Post-Bid
Miramar, FL 33025

District Energy System (DES) Floor Resurfacing
Results
Jacksonville, FL 32202

Floor and Carpet Care Services
Bidding
Gainesville, FL

Community Center - Flooring
Post-Bid
Port Saint Lucie, FL 34984

Reported 01/13/2021 12:00 AM
Project Title

Sunset Lakes Community Center Flooring Project

Physical Address View project details and contacts
City, State (County) Miramar, FL 33029   (Broward County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General Contractor to furnish all materials, equipment and labor for preparing the existing flooring and to install new wood vinyl flooring for the hallways and lobby area of Sunset Lakes Community Center (2801 SW 186th Ave, Miramar, FL 33029). 1. Remove furniture and equipment from construction area 2. Prep existing flooring 3. Remove excess glue from flooring and install Ardex feather finish 4. Furnish Amtico Spacia vinyl floor tiles 5. Install Amtico Spacia flooring tiles 6. Install transition pieces to new vinyl flooring for where needed 7. Furnish Johnsonite 4-inch cove base on walls 8. Placed removed furniture and equipment to its original location before construction

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents