Similar Projects
Ossining UFSD HVAC Improvements
Bidding
Ossining, NY 10562

Fujitsu HVAC Units
Bidding
NY

Job Order Contracting Services for Region 1 - HVAC
Post-Bid
White Plains, NY 10601

Job Order Contracting Services for Region 2 - HVAC
Post-Bid
White Plains, NY 10601

Library Building Chiller Replacement
Results
Valhalla, NY 10595

Job Order Contract- HVAC Work
Results
$8,500,000 to $11,500,000 est. value
Valhalla, NY 10595

HVAC Maintenance and Repair Service
Bidding
Armonk, NY

Job Order Contracting Services for Region 3 - HVAC
Post-Bid
White Plains, NY 10601

Replacement of Heating Units and Ventilation Fans at Central Maintenance Facility
Results
$5,000,000 to $5,500,000 est. value
Yonkers, NY

Installation of Air Handlers for DPW Garage on Fox Island Road
Post-Bid
Port Chester, NY 10573

Facility Wide HVAC Maintenance at WCC
Results
Valhalla, NY 10595

Cacace Justice Center Chiller Plant Replacement (AS)
Post-Bid
Yonkers, NY 10701

HVAC Service for 134 Court Street
Term Contract
Results
White Plains, NY 10601

2020-2025 Central Air Conditioning System Inspections With Preventative Maintenance, Start Up, and/or Repair Services
Term Contract
Post-Bid

HVAC and Refrigeration Work for the 2020/2021 School Year
Results
$193,050 est. value
Briarcliff Manor, NY 10510

Last Updated 05/21/2020 02:48 PM
Project Title

Steam System Upgrades at Michaelian Office Building

Physical Address View project details and contacts
City, State (County) White Plains, NY 10601   (Westchester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000 to $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract consists of providing all necessary labor, material and equipment required to replace existing Expansion Joints, Radiator Control Valves, Steam Traps and Zone Valve Actuators. Provide new steam pipe insulation and provide new piping to bypass existing condensate transfer pump to prevent spillage improving sanitation and energy efficiency. The project will also include metering capability to determine energy usage of the MOB. All required power and controls for the new system will be provided

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, Steam and Condensate Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents