Last Updated | 05/13/2023 02:34 AM |
Project Title | Patriot's Park Gym Reroof |
Physical Address | View project details and contacts |
City, State (County) | Grovetown, GA 30813 (Columbia County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $386,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bids for the complete work in one general contract shall be made on the electronic forms provided for all materials, equipment and labor for the construction of Patriots Park Gym Reroofing, as specified. SCOPE OF WORK: Please provide a proposal for a lump sum to furnish all material, labor, safety equipment, and lifting equipment for the scope of work described below. a) Properly remove existing roof and/or roof elements as needed, prepare, and clean the roof between administrative area and gym to be reroofed. b) The gym roofing shall remain. Prepare and clean the existing roof to accept the retrofit system as directed by the manufacturer. c) Furnish and install a TPO single ply retrofit system on the existing gym roof. This includes filling the flutes of the existing roof panel with loose laid and beveled 2.5" to 3" EPS insulation, installing a 1" polyiso insulation cover board (mechanically attached), and installing a new 60 mil TPO roof membrane. TPO membrane to be installed using a OMG Rhinobond or similar induction welding system. No fasters will be permitted to penetrate the TPO. Furnish and install TPO flashings at all vertical penetrations. Furnish and install all other roof accessories. d) Furnish and install a wood nailer at the perimeter of the roof to meet new insulation height e) Furnish and install a new edge metal at gutter, new coping, new gutters, and new downspouts for the gym roof and lower roof with skylights. Trim to be shop-fabricated 24 gauge Galvalume with kynar finish. Color to be chosen from manufacture's standard colors. f) Remove and replace existing skylights with Velux fixed FXG double dome acrylic skylights. Repair existing curbs as needed. g) Properly remove and dispose of existing metal standing seam roof over administrative area. h) Furnish and install a new standing seam metal roof. Basis of design shall be Petersen Snapclad, 24 gauge, 16" wide panels with striations. i) Furnish and install 3" of polyiso insulation under the new metal standing seam roof. j) Furnish and install a new edge metal at gutter, new coping, new gutters, and new downspouts at the administrative metal standing seam roof. Trim to be shopfabricated 24 gauge Galvalume with kynar finish. Color to be chosen from manufacture's standard colors. k) Provide a 20-year material and labor warranty for the TPO roof. l) Provide PAC Clad finish, material, and labor warranty for the metal standing steam roof Question Deadline 05/04/2023 at 12:00 PM ET |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |