Similar Projects
Last Updated | 08/21/2023 11:02 PM |
Project Title | Tactical Equipment Maintenance Facility, Fort Carson |
Physical Address | View project details and contacts |
City, State (County) | Colorado Springs, CO 80902 (El Paso County) |
Category(s) | Commercial, Government/Public, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $25,898,269 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract Award Date: Jul 21, 2023 Contract Award Number: W9128F23C0025 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: MKM2UNBJVD95 Contractor Awarded Name: HHI CORPORATION Contractor Awarded Address: Ogden, UT 84404 USA Base and All Options Value (Total Contract Value): $25,898,269.00 ***Am-0003 - Updated Specifications and DIV 00 Requirements*** ***Am-0002 - Updated Specifications and DIV 00 Requirements*** ***Am-0001 - Updated Specifications and DIV 00 Requirements*** Construct a SOF Tactical Equipment Maintenance Facility (TEMF). The maintenance facility will include oil storage building, vehicle component storage building, and organizational equipment parking. The TEMF shall provide an administration and shop control office, equipment maintenance systems office, weapons vault, shop stock listing room, repair exchange/tech support room, tool issuing/storage room, restrooms, janitorial closet, break/training/conference room, telecommunications room, utility rooms, organizational storage bays, maintenance and repair areas, fluid distribution room, and compressor room. The project shall provide a standalone prefabricated POL/hazardous waste storage building. The equipment maintenance facilities will include bridge cranes, maintenance bays including pits and vehicle lifts, administrative space, and tool storage areas. Construction consists of concrete foundation and floor slab with metal frame structure. Built-in building systems will include fire alarm/mass notification, fire suppression, energy management control, telephone and advanced unclassified and classified communications networks, cable TV, intrusion detection, closed circuit surveillance, and electronic access control systems, and hardened protected distribution system. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Supporting facilities include site preparation, hardstand, utilities (electrical, water, gas, sanitary sewer, chilled water, and information systems distribution), lighting, vehicle parking, access drives, curb and gutter, sidewalks, storm drainage, landscaping, roads, and other site improvements. Building feature include special foundations required for the expensive soils at Fort Carson. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current Department of Defense criteria. Access for persons with disabilities will be provided. Comprehensive interior design, design of electronic security, and audio-visual services are included. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the number of calendar days (stated in the solicitation) after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. The magnitude of construction costs for this project is between $10,000,000 and $25,000,000. The above project description is for information only. Project scope of work is subject to change. SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION: Please be advised of on-line registration requirements for Contractor Registration and for Representations and Certifications Application which are located in the System for Award Management "SAM" database at https://sam.gov/. The representation and certifications section in SAM are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year form the date of initial submission and expire on an annual basis from the update to SAM. OBTAINING SOLICITATION DOCUMENTS: Solicitation documents will be posted to the web via the Contract Opportunities tab at https://sam.gov. Find solicitation announcement in SAM: https://sam.gov/ Click on 'Search Contract Opportunities' under the Contract Opportunities title Use the 'Keywords' block to locate the project by entering the solicitation number or use the various advanced search blocks below the 'Keywords' search block. By using the 'login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. Once you have located your project, click on the link to solicitation to view the project. Files may be downloaded from this view under 'Attachments/Links'. If you want other vendors, sub-contractors, or contractors to contact you, click on the 'Interested Vendors' tab and then "add me to Interested Vendors' link at the bottom of the page. INQUIRIES: A bidder inquiry key will be included in the solicitation. Questions regarding the solicitation will be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/. SITE VISIT INFORMATION A site visit will held on October 6th at 11:00am MST. Participants can meet at the Fort Carson North Resident Office (1626 Evans Street, Bldg 1219 Rm 150, Fort Carson Colorado, 80913). For additional details, contact: Sachkia Hamilton, Sachkia.A.Hamilton@usace.army.mil, 719.503.6983 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |