Similar Projects
Service Street Auto Repair / Colorado Springs
New Construction, Infrastructure
Conception
$1,700,000 CJ est. value
Colorado Springs, CO 80908

New Fire Station - Tri-Lakes Monument Fire Protection District
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Monument, CO 80132

Hancock and Delta Mixed-Use Development
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Colorado Springs, CO 80910

Academy Heights Apartments
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Colorado Springs, CO 80916

Super Star Car Wash - Razorback and Voyager
New Construction, Infrastructure - 6,576 SF
Bidding
$1,000,000 CJ est. value
Colorado Springs, CO 80920

PPRTA Pipe Lining Projects
Infrastructure
Bidding
$700,000 CJ est. value
Colorado Springs, CO 80903

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Pioneer Village Road Maintenance Services
Alteration
Post-Bid
Colorado Springs, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

UTE Valley Regional Trail Construction
Results
$150,000 to $200,000 est. value
Colorado Springs, CO

Hampton Inn
New Construction
Construction
$2,000,000 est. value
Colorado Springs, CO 80900

Falcon Commerce Center
New Construction
Construction
$190,000 est. value
Monument, CO 80921

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Corvallis
New Construction, Infrastructure
Design
$480,000,000 CJ est. value
Fountain, CO 80925

Last Updated 09/26/2022 10:39 AM
Project Title

Street Improvements Uinta Road and a portion of Via Chula Vista

Physical Address View project details and contacts
City, State (County) Manitou Springs, CO 80829   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $88,298 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Manitou Springs is accepting bids for the mill and paving of Uinta Road and a portion of Via Chula Vista There will not be a public bid opening A 5% bid bond is required for the project The Selected Contractor will be required to obtain performance and payment bonds to cover 100% of the project contract amount. Notice of Award is expected by July 11th and work should be expected to start on or after the week of August 17th - pending approval of Manitou Springs City Council and Pikes Peak Rural Transportation Authority (PPRTA). PPRTA will be utilized to fund this project. PPRTA Special Provisions will be part of the awarded contract. Question Acceptance Deadline 06/29/2022 06:00 PM EDT Questions are submitted online No Award Requirements - Reserve Rights to Award by Line Item The bid shall have an Anticipated Scope of Services that includes the following: The Contractor will provide project costs for crews and equipment, anticipated mobilization time, and anticipated project completion time. The Contractor is responsible to provide all materials and equipment necessary for fabrication, construction, and/or installation of this project. The Contractor is responsible for clean-up of area and affected near-by areas of the project and removal of all wastes on a daily basis. The Contractor is responsible for damages, inside or outside the project area. The Contractor is responsible for their own confined space, roadway, and trenching safety procedures. If the project requires street closure - partial or otherwise, the Contractor shall provide all necessary traffic control. All traffic control personnel must at a minimum carry a current CDOT Flagger Certification. A Traffic Control Plan must be submitted to and approved by City staff at the pre-construction meeting. The pre-construction is to be scheduled at time of accepting the contract. Notice of Award is expected by July 11 th and work should be expected to start on or after the week of August 17 th

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents