Similar Projects
Florentine Storm Drain and Sewer - City of Prescott Valley
Infrastructure
Conception
$2,500,000 CJ est. value
Prescott Valley, AZ 86314

Production Well No. 3 CV - Rehabilitation - 19020 - City of Prescott
Infrastructure
Conception
$2,500,000 CJ est. value
Prescott, AZ 86303

Fire Drill Ground Improvements - 17001 - City of Prescott
Demolition, New Construction, Infrastructure
Design
$3,487,427 CJ est. value
Prescott, AZ 86303

Bell Rock Trail Water Storage Tank
New Construction, Infrastructure - 2,350 SF
Design
$2,000,000 CJ est. value
Sedona, AZ 86336

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Construction Manager - Desert Star Community School - Phase 3
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Cornville, AZ 86325

Water Line Improvements and Hydrant Installation
Infrastructure
Post-Bid
Jerome, AZ 86331

Sedona Airport Infield RSA Drainage Improvements (Phase 1)
Infrastructure
Post-Bid
$850,699 CJ est. value
Sedona, AZ 86336

15ft Tanks for Willow Beach National Fish Hatchery
Term Contract
Results
Willow Beach, AZ 86445

Rocky Dells Water Main Replacement Project
Infrastructure
Results
Prescott, AZ

Zone 41 (Mingus) Pump Station, Tank and Pipeline - City of Prescott
New Construction, Infrastructure
Pending Verification
$8,414,359 CJ est. value
Prescott, AZ 86303

Zone 41 (Mingus) Pump Station, Tank and Pipeline - City of Prescott
New Construction, Infrastructure
Pending Verification
$8,414,359 CJ est. value
Prescott, AZ 86303

Florentine Road Water Improvements - City Of Prescott Valley
Infrastructure
Conception
$300,000 CJ est. value
Prescott Valley, AZ 86314

SundogTrunk Main, Phase C - City of Prescott
Infrastructure
Design
$8,210,957 CJ est. value
Prescott, AZ 86301

Back O' Beyond Low Water Crossing Improvements Project
Infrastructure
Bidding
Sedona, AZ 86336

Last Updated 03/17/2023 04:33 PM
Project Title

Zone 56 Tank and Zone 7 Pump Station - City of Prescott

Physical Address View project details and contacts
City, State (County) Prescott, AZ 86303   (Yavapai County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,364,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of a new 1.5 million gallon tank and 4,400 LF of 16" waterline from the new tank westward to U-Haul along SR69 for Zone 56. As of March 17th, 2023, this project is currently in construction stage. Construction is set to end roughly in 18 months.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents