Similar Projects
Periodic Maintenance on Operable Walls
Term Contract
Bidding
Baltimore, MD 21201

Forest Hill Center Interior Renovation
Alteration
Bidding
Bel Air, MD

Repair Fire Suppression, HVAC, Mold Building 1915
Post-Bid
$1,000,000 to $5,000,000 est. value
Andrews Air Force Base, MD 20762

Installation of Blackout Roller Shades at Mechanicsville Elementary
Post-Bid
Mechanicsville, MD 20659

Interior Alternation
Results
Patuxent River, MD 20670

Drinking Fountain Replacement at Various WCPS Facilities
Results
Hagerstown, MD 21740

Gardener`s Cottage Chimney Repair
Post-Bid
Saint Leonard, MD 20685

Pool Refresh, Ceiling Replacement & Paint, PE Building, Rockville Campus
Results
Rockville, MD 20850

Interior Finishing and Furnishing and Remodeling Services
Post-Bid
Salisbury, MD

Remove and Replace Galvanized Stairs CFMR
Results
$15,000 est. value
Reisterstown, MD 21136

ROCC Acoustic Wall Paneling - Quet Room
Alteration
Post-Bid
Hyattsville, MD 20785

Ceiling Board and Grid System
Results
Rockville, MD 20850

Painting Inside MWR Gym at USCG Yard
Term Contract
Post-Bid
Curtis Bay, MD 21226

Bowie Senior Center Cabinet and Counter Replacement Project
Results
Bowie, MD 20716

Drywall Finish, Painting and Kitchen Sink Install
Term Contract
Post-Bid
Less than $25,000 est. value
Middle River, MD 21220

Reported 11/30/2021 12:00 AM
Project Title

DJAFTC Mason Wall Repairs

Physical Address View project details and contacts
City, State (County) Leonardtown, MD 20650   (Saint Marys County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Grout hair line cracks as identified in Attachment 1. Remove, dispose, and replace the facade masonry column as identified in Attachment 1 Repaint the areas effected by the grouting and column replacement, at a minimum this will include the area 1 foot on either side of the grouting and the entire column being replaced, SMCPS will provide the color upon award. o The primer will be Sherwin Williams B51W001450 primer / Sherwin Williams A88W01151 paint or equivalent. The contractor will provide all tools, materials, labor, and coordination required to complete this scope of work, this WILL include a lift or scaffolding equipment. Contractor will remove all debris from the site and dispose of properly.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents