Similar Projects
Citywide Street Lights Groups 1701 and 1702
Infrastructure
Design
$810,245 CJ est. value
San Diego, CA 92101

Provide and Replace Inverter and Protection Batteries at Lake Hodges Pumped Storage and Hydroelectric Facility
Alteration
Design
$200,000 est. value
San Diego, CA 92101

Kit Carson Park Lighting Project
Infrastructure
Sub-Bidding
$800,000 CJ est. value
Escondido, CA 92025

As-Needed Traffic Signal Controllers and Related Equipment
Term Contract
Sub-Bidding
San Diego, CA 92101

Emergency Generator Maintenance
Term Contract, Alteration
Post-Bid
San Diego, CA 92101

San Diego Field Office Security Upgrades
Alteration
Post-Bid
$968,700 est. value
San Diego, CA

City Hall Improvements - Phase Two
Renovation, Alteration
Results
$1,200,000 est. value
Encinitas, CA

SDIA - Airport Administration Building - Electrical
Alteration
Results
San Diego, CA 92108

Gas Turbine Generator Maintenance, Inspection and Repair
Term Contract
Sub-Bidding
San Diego, CA 92179

VA Resident Guard System Installation & Testing
Term Contract
Post-Bid
San Diego, CA 92161

Fire Admin Offices at Public Safety Center
Term Contract, Alteration
Results
$420,000 est. value
El Cajon, CA

Neighborhood Street Lights 2022
Infrastructure
Sub-Bidding
$725,000 CJ est. value
El Cajon, CA 92020

CHP Border Division - Elevator Maintenance Services
Alteration
Post-Bid
San Diego, CA 92123

Place Minor Concrete, Replace Irrigation and Electrical Facilities
Alteration
Results
$5,400,000 est. value
CA

RFQ Contractor - San Luis Rey Elementary School Campus Modernization - Electrical
Renovation
Sub-Bidding
$4,500,000 CJ est. value
Oceanside, CA 92054

Last Updated 08/29/2022 08:33 AM
Project Title

Replace Primary Substation, Transformer and Dual Primary Selective Switches

Physical Address View project details and contacts
City, State (County) San Diego, CA 92161   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project No.: 664-19-303 Project Title: Replace Primary Substations, Transformer & Dual Primary Selective Switches Project Location: 3350 La Jolla Village Drive, San Diego VA Health Care System (SDVAHCS), San Diego, CA 92161 Contractor shall provide all plant, tools, labor, materials, equipment, expertise, administration, supervision, and transportation necessary to perform all work to Replace Primary Substations, Transformer & Dual Primary Selective Switches in Building #1 and Building #2. There are nine substations included in this SOW located in the following areas: 4 Substations in the Basement of Building 1, 1 Substation in the Penthouse of Building 1, 4 Substations in the Central Plant at Building 2. All work shall be completed per Scope of Work, Terms, Conditions, Provisions, Clauses, Drawings and Specifications. This construction acquisition will be procured in accordance with FAR 14, Sealed Bidding (IFB) In accordance with established Public Laws, all Bidders are required to be registered and be current with WWW.SAM.GOV, and WWW.VETBIZ.GOV. THIS IS A TOTAL SMALL BUSINESS SET-ASIDE PROCUREMENT IAW PUBLIC LAW 38 USC 8127(d). Although not mandatory, all interested Contractors are strongly encouraged to attend Prebid Meeting / Site Visit Pre-Bid Meeting/Site visit is scheduled on July 29, 2022 at 1:00pm. All interested Participants will meet at - Building 27, Conference Room 1102, SDVAMC, 3350 La Jolla Village Drive, San Diego, CA. 92161 Bid opening is scheduled on August 26, 2022 at 1:00pm, local time, Building 27, Conference Room 1102, SDVAMC Bid Bond, Payment Bond, and Performance Bond shall all be required. Applicable NAICS Code: 238210, Electrical Contractors and Other Wiring Installation Contractors Size Standard $16.5Mil Magnitude of this VA this project: between $10,000,000 and $20,000,000. Request for Information (RFI's) are no later than August 12, 2022 4:30pm local time * See Warranty Management in Specifications Due to the importance of maintaining the schedule for this project, it is requested that all questions regarding the specifications and/or drawings be submitted by no later than 4:30pm local time August 12, 2022. All questions must be in writing and emailed to ashok.singh@va.gov. Any questions received after the above date will be answered at the discretion of the Contracting Officer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. complete it within _____360_______ calendar days

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents